Ardgay
ARDScotlandManaged by ScotRail
How this station is performing
Ardgay had 3,614 scheduled stops to Period 7 of 2026-27, about 10 a day. 82.1% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Ardgay opened on 1 October 1864, 162 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Ardgay is the oldest; the next oldest, Tain, dates from 1864.
The nearest stations to Ardgay are Culrain (4.9 km north-west), Invershin (5.3 km north-west), Lairg (13.6 km north), Rogart (17.0 km north-east) and Tain (19.8 km east). 2 stations lie within 10 km in all. Of the five, Tain is the most punctual at 83.2% and Lairg the least at 76.4%, with Ardgay on 82.1%.
Ardgay takes its name from a settlement called Ardgay, home to about 517 people, and the station stands 0.1 km from its centre.
Ardgay improved sharply over the past year. In the latest 13 periods 82.1% of stops came within three minutes of the timetable, up 8.8 percentage points from 73.3% in the 13 before. Cancellations held steady at 3.4% of scheduled stops, against 3.3% before.
2 of 3 stations of a similar size in Scotland are more punctual than Ardgay on 82.1%. The comparison group includes Stranraer (87.1%), Barrhill (87.3%) and Dalwhinnie (53.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 3,614 | 82.1% | 3.4% |
Operators with their own page for this station are linked to it.
Late train at Ardgay? Delay Repay
These operators call at Ardgay and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 295 | 80.3% | 3.1% |
| Period 6 of 2026-27 | 296 | 82.5% | 3.7% |
| Period 5 of 2026-27 | 294 | 91.8% | 3.7% |
| Period 4 of 2026-27 | 292 | 86.0% | 3.8% |
| Period 3 of 2026-27 | 75 | 83.0% | 0.0% |
| Period 2 of 2026-27 | 296 | 87.1% | 0.7% |
| Period 1 of 2026-27 | 342 | 90.6% | 1.5% |
| Period 13 of 2025-26 | 320 | 83.6% | 2.5% |
| Period 12 of 2025-26 | 296 | 89.8% | 3.4% |
| Period 11 of 2025-26 | 272 | 73.4% | 7.0% |
| Period 10 of 2025-26 | 249 | 81.9% | 5.6% |
| Period 9 of 2025-26 | 292 | 76.3% | 5.5% |
| Period 8 of 2025-26 | 295 | 62.7% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stranraer | 3,441 | 87.1% | 1.5% |
| Barrhill | 3,438 | 87.3% | 1.5% |
| Dalwhinnie | 3,989 | 53.3% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out