Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Stranraer

STRScotlandManaged by ScotRail

On time, last 13 periods87.1%Great Britain: 83.6%
Cancelled1.5%Great Britain: 3.2%
Stops a day10Scheduled, on average
Punctuality rank862nd of 2,374Among ranked stations

How this station is performing

Stranraer had 3,441 scheduled stops to Period 7 of 2026-27, about 10 a day. 87.1% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.

Stranraer opened on 1 October 1862, 164 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Maybole is the oldest (1856) and Newton-on-Ayr the newest (1886), with Stranraer in between.

Stranraer is remote: its nearest neighbours are Barrhill (26.0 km north-east), Girvan (39.1 km north), Maybole (54.0 km north-east), Ayr (66.1 km north) and Newton-on-Ayr (67.7 km north). At 87.1%, Stranraer is less punctual than all of them; the best of the five, Ayr, manages 91.5%.

Stranraer takes its name from a town called Stranraer, home to about 10,320 people, and the station stands 1.1 km from its centre.

Stranraer improved sharply over the past year. In the latest 13 periods 87.1% of stops came within three minutes of the timetable, up 23.0 percentage points from 64.1% in the 13 before. Cancellations fell to 1.5% of scheduled stops from 2.4%, which is 0.9 percentage points fewer.

1 of 3 stations of a similar size in Scotland are more punctual than Stranraer on 87.1%. The comparison group includes Barrhill (87.3%), Ardgay (82.1%) and Fort William (82.2%).

Period by period

40%60%80%100%2023-242024-252025-262026-27Period 1 of 2023-24: 90.9%Period 2 of 2023-24: 94.5%Period 3 of 2023-24: 90.2%Period 4 of 2023-24: 91.4%Period 5 of 2023-24: 88.2%Period 6 of 2023-24: 93.2%Period 7 of 2023-24: 86.9%Period 8 of 2023-24: 95.8%Period 4 of 2024-25: 49.5%Period 5 of 2024-25: 84.8%Period 6 of 2024-25: 78.8%Period 7 of 2024-25: 76.1%Period 8 of 2024-25: 82.8%Period 9 of 2024-25: 67.0%Period 10 of 2024-25: 77.5%Period 11 of 2024-25: 75.6%Period 12 of 2024-25: 71.6%Period 13 of 2024-25: 71.9%Period 1 of 2025-26: 61.2%Period 2 of 2025-26: 61.4%Period 3 of 2025-26: 59.4%Period 4 of 2025-26: 53.4%Period 5 of 2025-26: 53.8%Period 6 of 2025-26: 46.7%Period 7 of 2025-26: 55.0%Period 8 of 2025-26: 68.6%Period 9 of 2025-26: 80.9%Period 10 of 2025-26: 81.9%Period 11 of 2025-26: 93.0%Period 12 of 2025-26: 95.3%Period 13 of 2025-26: 92.4%Period 1 of 2026-27: 93.0%Period 2 of 2026-27: 91.4%Period 3 of 2026-27: 90.7%Period 4 of 2026-27: 86.1%Period 5 of 2026-27: 83.7%Period 6 of 2026-27: 88.1%Period 7 of 2026-27: 81.2%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 1.4%Period 2 of 2023-24: 1.8%Period 3 of 2023-24: 1.4%Period 4 of 2023-24: 0.0%Period 5 of 2023-24: 0.0%Period 6 of 2023-24: 0.0%Period 7 of 2023-24: 2.7%Period 8 of 2023-24: 1.0%Period 4 of 2024-25: 2.0%Period 5 of 2024-25: 0.0%Period 6 of 2024-25: 1.4%Period 7 of 2024-25: 0.0%Period 8 of 2024-25: 2.1%Period 9 of 2024-25: 5.7%Period 10 of 2024-25: 3.3%Period 11 of 2024-25: 6.2%Period 12 of 2024-25: 0.7%Period 13 of 2024-25: 3.1%Period 1 of 2025-26: 0.8%Period 2 of 2025-26: 0.0%Period 3 of 2025-26: 0.7%Period 4 of 2025-26: 1.1%Period 5 of 2025-26: 2.2%Period 6 of 2025-26: 1.4%Period 7 of 2025-26: 4.4%Period 8 of 2025-26: 2.1%Period 9 of 2025-26: 2.5%Period 10 of 2025-26: 4.2%Period 11 of 2025-26: 2.5%Period 12 of 2025-26: 0.7%Period 13 of 2025-26: 1.6%Period 1 of 2026-27: 1.9%Period 2 of 2026-27: 0.7%Period 3 of 2026-27: 0.0%Period 4 of 2026-27: 0.0%Period 5 of 2026-27: 2.9%Period 6 of 2026-27: 0.7%Period 7 of 2026-27: 1.4%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
ScotRail3,44187.1%1.5%

Operators with their own page for this station are linked to it.

Late train at Stranraer? Delay Repay

These operators call at Stranraer and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2728081.2%1.4%
Period 6 of 2026-2728088.1%0.7%
Period 5 of 2026-2713983.7%2.9%
Period 4 of 2026-2728086.1%0.0%
Period 3 of 2026-2728090.7%0.0%
Period 2 of 2026-2728091.4%0.7%
Period 1 of 2026-2732093.0%1.9%
Period 13 of 2025-2630692.4%1.6%
Period 12 of 2025-2628095.3%0.7%
Period 11 of 2025-2628093.0%2.5%
Period 10 of 2025-2623781.9%4.2%
Period 9 of 2025-2619980.9%2.5%
Period 8 of 2025-2628068.6%2.1%

Time of year

70%75%80%85%90%P1: 82.7%1P2: 82.3%2P3: 80.1%3P4: 74.2%4P5: 75.5%5P6: 76.5%6P7: 73.8%7P8: 78.7%8P9: 72.9%9P10: 79.7%10P11: 85.7%11P12: 83.4%12P13: 82.6%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Scotland

StationScheduled stopsWithin 3 minCancelled
Barrhill3,43887.3%1.5%
Ardgay3,61482.1%3.4%
Fort William3,10782.2%0.8%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out