Stranraer
STRScotlandManaged by ScotRail
How this station is performing
Stranraer had 3,441 scheduled stops to Period 7 of 2026-27, about 10 a day. 87.1% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Stranraer opened on 1 October 1862, 164 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Maybole is the oldest (1856) and Newton-on-Ayr the newest (1886), with Stranraer in between.
Stranraer is remote: its nearest neighbours are Barrhill (26.0 km north-east), Girvan (39.1 km north), Maybole (54.0 km north-east), Ayr (66.1 km north) and Newton-on-Ayr (67.7 km north). At 87.1%, Stranraer is less punctual than all of them; the best of the five, Ayr, manages 91.5%.
Stranraer takes its name from a town called Stranraer, home to about 10,320 people, and the station stands 1.1 km from its centre.
Stranraer improved sharply over the past year. In the latest 13 periods 87.1% of stops came within three minutes of the timetable, up 23.0 percentage points from 64.1% in the 13 before. Cancellations fell to 1.5% of scheduled stops from 2.4%, which is 0.9 percentage points fewer.
1 of 3 stations of a similar size in Scotland are more punctual than Stranraer on 87.1%. The comparison group includes Barrhill (87.3%), Ardgay (82.1%) and Fort William (82.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 3,441 | 87.1% | 1.5% |
Operators with their own page for this station are linked to it.
Late train at Stranraer? Delay Repay
These operators call at Stranraer and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 280 | 81.2% | 1.4% |
| Period 6 of 2026-27 | 280 | 88.1% | 0.7% |
| Period 5 of 2026-27 | 139 | 83.7% | 2.9% |
| Period 4 of 2026-27 | 280 | 86.1% | 0.0% |
| Period 3 of 2026-27 | 280 | 90.7% | 0.0% |
| Period 2 of 2026-27 | 280 | 91.4% | 0.7% |
| Period 1 of 2026-27 | 320 | 93.0% | 1.9% |
| Period 13 of 2025-26 | 306 | 92.4% | 1.6% |
| Period 12 of 2025-26 | 280 | 95.3% | 0.7% |
| Period 11 of 2025-26 | 280 | 93.0% | 2.5% |
| Period 10 of 2025-26 | 237 | 81.9% | 4.2% |
| Period 9 of 2025-26 | 199 | 80.9% | 2.5% |
| Period 8 of 2025-26 | 280 | 68.6% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barrhill | 3,438 | 87.3% | 1.5% |
| Ardgay | 3,614 | 82.1% | 3.4% |
| Fort William | 3,107 | 82.2% | 0.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out