Anerley
ANZLondonManaged by London Overground
How this station is performing
Anerley had 53,178 scheduled stops to Period 7 of 2026-27, about 146 a day. 93.6% of recorded arrivals were within three minutes of the timetable and 7.3% of scheduled stops were cancelled.
Anerley opened on 5 June 1839, 187 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Anerley is the oldest; the next oldest, Crystal Palace, dates from 1854.
The nearest stations to Anerley are Penge West (0.6 km north-east), Crystal Palace (0.7 km north-west), Penge East (1.1 km north-east), Birkbeck (1.2 km south-east) and Kent House (1.4 km east). 104 stations lie within 10 km in all. Of the five, Birkbeck is the most punctual at 98.1% and Penge East the least at 84.5%, with Anerley on 93.6%.
Anerley takes its name from an area of London called Anerley, and the station stands 0.3 km from its centre.
2 operators call at Anerley: London Overground (93.9%, 96% of stops) and GTR (87.2%, 4% of stops). The operator you travel with matters: London Overground reaches 93.9% within three minutes while GTR manages 87.2%, a gap of 6.7 percentage points.
Compared with 3 stations of a similar size in London, Anerley is the most punctual, at 93.6%. The comparison group includes Kensal Green (91.8%), Kilburn High Road (92.5%) and Queens Park (London) (92.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 50,840 | 93.9% | 7.4% |
| GTR | 2,338 | 87.2% | 4.7% |
Operators with their own page for this station are linked to it.
Late train at Anerley? Delay Repay
These operators call at Anerley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,173 | 93.0% | 4.5% |
| Period 6 of 2026-27 | 3,850 | 91.8% | 9.0% |
| Period 5 of 2026-27 | 3,880 | 90.9% | 12.5% |
| Period 4 of 2026-27 | 4,033 | 93.5% | 11.9% |
| Period 3 of 2026-27 | 4,098 | 94.6% | 6.2% |
| Period 2 of 2026-27 | 3,992 | 94.3% | 5.7% |
| Period 1 of 2026-27 | 4,767 | 95.1% | 6.6% |
| Period 13 of 2025-26 | 4,284 | 95.3% | 4.7% |
| Period 12 of 2025-26 | 4,187 | 94.5% | 8.7% |
| Period 11 of 2025-26 | 4,041 | 93.0% | 8.4% |
| Period 10 of 2025-26 | 3,753 | 95.3% | 5.4% |
| Period 9 of 2025-26 | 4,120 | 92.5% | 6.5% |
| Period 8 of 2025-26 | 4,000 | 92.6% | 4.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kensal Green | 53,496 | 91.8% | 2.8% |
| Kilburn High Road | 53,533 | 92.5% | 3.1% |
| Queens Park (London) | 53,536 | 92.4% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out