GTR at Anerley
How this operator is doing here
GTR had 2,338 scheduled stops at Anerley in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 87.2% of recorded arrivals came within three minutes and 4.7% of stops were cancelled.
GTR trains at Anerley also serve Penge West (0.6 km north-east, 86.2% on time, 4.7% cancelled), Crystal Palace (0.7 km north-west, 93.6% on time, 2.8% cancelled), Birkbeck (1.2 km south-east, 98.1% on time, 2.8% cancelled), Gipsy Hill (1.8 km north-west, 95.4% on time, 2.8% cancelled), Sydenham (London) (1.9 km north-east, 91.9% on time, 3.7% cancelled) and Norwood Junction (1.9 km south, 86.8% on time, 3.9% cancelled), which are the stations on its network closest to Anerley.
Within 30 km of here, GTR runs best at Birkbeck, 1.2 km south-east (98.1%), and worst at Kenley, 10.1 km south (66.9%).
The busiest GTR station within 30 km of Anerley is East Croydon, 4.5 km south-west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Anerley, GTR is the least punctual, at 87.2%.
GTR at Anerley has slipped a little, from 91.4% within three minutes in the previous 13 periods to 87.2% in the latest 13, a fall of 4.2 percentage points. Cancellations rose to 4.7% of scheduled stops from 3.2%, which is 1.5 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 207 | 87.4% | 2.4% |
| Period 6 of 2026-27 | 166 | 81.9% | 6.6% |
| Period 5 of 2026-27 | 102 | 84.2% | 1.0% |
| Period 4 of 2026-27 | 193 | 85.1% | 2.6% |
| Period 3 of 2026-27 | 194 | 90.9% | 4.1% |
| Period 2 of 2026-27 | 188 | 91.0% | 4.8% |
| Period 1 of 2026-27 | 220 | 91.8% | 5.0% |
| Period 13 of 2025-26 | 224 | 91.4% | 5.8% |
| Period 12 of 2025-26 | 205 | 84.9% | 9.3% |
| Period 11 of 2025-26 | 204 | 85.1% | 4.4% |
| Period 10 of 2025-26 | 107 | 90.3% | 3.7% |
| Period 9 of 2025-26 | 164 | 85.2% | 0.6% |
| Period 8 of 2025-26 | 164 | 81.3% | 7.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Anerley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 50,840 | 93.9% | 7.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out