Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Anerley

All trains at AnerleyGTR across BritainLondon

On time, last 13 periods87.2%Whole station: 93.6%
Cancelled4.7%Whole station: 7.3%
Scheduled stops2,338Of 53,178 at the station

How this operator is doing here

GTR had 2,338 scheduled stops at Anerley in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 87.2% of recorded arrivals came within three minutes and 4.7% of stops were cancelled.

GTR trains at Anerley also serve Penge West (0.6 km north-east, 86.2% on time, 4.7% cancelled), Crystal Palace (0.7 km north-west, 93.6% on time, 2.8% cancelled), Birkbeck (1.2 km south-east, 98.1% on time, 2.8% cancelled), Gipsy Hill (1.8 km north-west, 95.4% on time, 2.8% cancelled), Sydenham (London) (1.9 km north-east, 91.9% on time, 3.7% cancelled) and Norwood Junction (1.9 km south, 86.8% on time, 3.9% cancelled), which are the stations on its network closest to Anerley.

Within 30 km of here, GTR runs best at Birkbeck, 1.2 km south-east (98.1%), and worst at Kenley, 10.1 km south (66.9%).

The busiest GTR station within 30 km of Anerley is East Croydon, 4.5 km south-west, with about 813 scheduled stops a day.

Of the 2 operators with enough records at Anerley, GTR is the least punctual, at 87.2%.

GTR at Anerley has slipped a little, from 91.4% within three minutes in the previous 13 periods to 87.2% in the latest 13, a fall of 4.2 percentage points. Cancellations rose to 4.7% of scheduled stops from 3.2%, which is 1.5 percentage points more.

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 86.7%Period 4 of 2023-24: 91.8%Period 5 of 2023-24: 96.7%Period 6 of 2023-24: 94.5%Period 8 of 2023-24: 96.8%Period 9 of 2023-24: 94.6%Period 11 of 2023-24: 83.3%Period 12 of 2023-24: 95.3%Period 13 of 2023-24: 95.2%Period 1 of 2024-25: 87.3%Period 2 of 2024-25: 98.2%Period 3 of 2024-25: 90.3%Period 4 of 2024-25: 96.8%Period 5 of 2024-25: 91.5%Period 6 of 2024-25: 96.8%Period 7 of 2024-25: 93.2%Period 8 of 2024-25: 87.7%Period 9 of 2024-25: 88.1%Period 10 of 2024-25: 86.1%Period 11 of 2024-25: 89.7%Period 12 of 2024-25: 94.4%Period 13 of 2024-25: 92.6%Period 1 of 2025-26: 94.9%Period 2 of 2025-26: 87.4%Period 3 of 2025-26: 96.0%Period 4 of 2025-26: 93.3%Period 5 of 2025-26: 93.6%Period 6 of 2025-26: 92.1%Period 7 of 2025-26: 94.0%Period 8 of 2025-26: 81.3%Period 9 of 2025-26: 85.2%Period 10 of 2025-26: 90.3%Period 11 of 2025-26: 85.1%Period 12 of 2025-26: 84.9%Period 13 of 2025-26: 91.4%Period 1 of 2026-27: 91.8%Period 2 of 2026-27: 91.0%Period 3 of 2026-27: 90.9%Period 4 of 2026-27: 85.1%Period 5 of 2026-27: 84.2%Period 6 of 2026-27: 81.9%Period 7 of 2026-27: 87.4%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 6.3%Period 4 of 2023-24: 0.0%Period 5 of 2023-24: 1.6%Period 6 of 2023-24: 1.8%Period 8 of 2023-24: 3.1%Period 9 of 2023-24: 3.4%Period 11 of 2023-24: 0.0%Period 12 of 2023-24: 0.0%Period 13 of 2023-24: 1.6%Period 1 of 2024-25: 1.8%Period 2 of 2024-25: 5.1%Period 3 of 2024-25: 0.0%Period 4 of 2024-25: 3.1%Period 5 of 2024-25: 4.8%Period 6 of 2024-25: 1.6%Period 7 of 2024-25: 7.8%Period 8 of 2024-25: 0.9%Period 9 of 2024-25: 4.8%Period 10 of 2024-25: 2.5%Period 11 of 2024-25: 2.5%Period 12 of 2024-25: 1.8%Period 13 of 2024-25: 4.7%Period 1 of 2025-26: 4.2%Period 2 of 2025-26: 3.8%Period 3 of 2025-26: 4.5%Period 4 of 2025-26: 5.0%Period 5 of 2025-26: 4.3%Period 6 of 2025-26: 2.6%Period 7 of 2025-26: 4.5%Period 8 of 2025-26: 7.9%Period 9 of 2025-26: 0.6%Period 10 of 2025-26: 3.7%Period 11 of 2025-26: 4.4%Period 12 of 2025-26: 9.3%Period 13 of 2025-26: 5.8%Period 1 of 2026-27: 5.0%Period 2 of 2026-27: 4.8%Period 3 of 2026-27: 4.1%Period 4 of 2026-27: 2.6%Period 5 of 2026-27: 1.0%Period 6 of 2026-27: 6.6%Period 7 of 2026-27: 2.4%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2720787.4%2.4%
Period 6 of 2026-2716681.9%6.6%
Period 5 of 2026-2710284.2%1.0%
Period 4 of 2026-2719385.1%2.6%
Period 3 of 2026-2719490.9%4.1%
Period 2 of 2026-2718891.0%4.8%
Period 1 of 2026-2722091.8%5.0%
Period 13 of 2025-2622491.4%5.8%
Period 12 of 2025-2620584.9%9.3%
Period 11 of 2025-2620485.1%4.4%
Period 10 of 2025-2610790.3%3.7%
Period 9 of 2025-2616485.2%0.6%
Period 8 of 2025-2616481.3%7.9%

Time of year

75%80%85%90%95%P1: 91.5%1P2: 90.6%2P3: 92.7%3P4: 90.2%4P5: 91.3%5P6: 89.4%6P7: 90.7%7P8: 87.1%8P9: 87.7%9P10: 88.5%10P11: 86.6%11P12: 90.2%12P13: 92.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Anerley

OperatorScheduled stopsWithin 3 minCancelled
London Overground50,84093.9%7.4%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out