Kilburn High Road had 53,533 scheduled stops to Period 7 of 2026-27, about 147 a day. 92.5% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Kilburn High Road opened on 3 May 1852, 174 years before the latest figures here, and has not been moved since. The First World War closed Kilburn High Road on 1 January 1917, and it reopened on 10 July 1922. Of the 5 stations nearest to it with a known opening date, Kilburn High Road is the oldest; the next oldest, Brondesbury, dates from 1860.
The nearest stations to Kilburn High Road are South Hampstead (1.0 km north-east), Queens Park (London) (1.0 km south-west), West Hampstead (1.1 km north), Brondesbury (1.1 km north-west) and West Hampstead Thameslink (1.2 km north). 108 stations lie within 10 km in all. Of the five, South Hampstead is the most punctual at 92.6% and West Hampstead Thameslink the least at 75.5%, with Kilburn High Road on 92.5%.
Kilburn High Road is named after Kilburn, an area of London, home to about 16,989 people, but the station stands 0.9 km from its centre.
1 of 3 stations of a similar size in London are more punctual than Kilburn High Road on 92.5%. The comparison group includes Queens Park (London) (92.4%), Kensal Green (91.8%) and Anerley (93.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 53,533 | 92.5% | 3.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,023 | 88.1% | 1.5% |
| Period 6 of 2026-27 | 3,957 | 89.0% | 4.5% |
| Period 5 of 2026-27 | 3,772 | 93.2% | 4.2% |
| Period 4 of 2026-27 | 4,051 | 91.1% | 2.9% |
| Period 3 of 2026-27 | 3,922 | 93.3% | 2.3% |
| Period 2 of 2026-27 | 3,900 | 93.8% | 3.4% |
| Period 1 of 2026-27 | 4,221 | 94.8% | 1.9% |
| Period 13 of 2025-26 | 4,348 | 96.0% | 1.4% |
| Period 12 of 2025-26 | 4,087 | 92.9% | 3.0% |
| Period 11 of 2025-26 | 4,384 | 92.1% | 4.0% |
| Period 10 of 2025-26 | 4,839 | 92.3% | 4.6% |
| Period 9 of 2025-26 | 4,250 | 90.5% | 4.0% |
| Period 8 of 2025-26 | 3,779 | 94.8% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Queens Park (London) | 53,536 | 92.4% | 2.9% |
| Kensal Green | 53,496 | 91.8% | 2.8% |
| Anerley | 53,178 | 93.6% | 7.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out