Queens Park (London) had 53,536 scheduled stops to Period 7 of 2026-27, about 147 a day. 92.4% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Queens Park (London) opened on 3 June 1879, 147 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Kilburn High Road is the oldest (1852) and Kensal Green the newest (1916), with Queens Park (London) in between.
The nearest stations to Queens Park (London) are Brondesbury Park (0.8 km north-west), Kilburn High Road (1.0 km north-east), Kensal Rise (1.1 km west), Brondesbury (1.2 km north) and Kensal Green (1.4 km west). 101 stations lie within 10 km in all. Of the five, Kilburn High Road is the most punctual at 92.5% and Brondesbury the least at 77.8%, with Queens Park (London) on 92.4%.
Queens Park (London) is named after Queen's Park, an area of London, home to about 12,753 people, but the station stands 0.2 km from its centre.
2 of 3 stations of a similar size in London are more punctual than Queens Park (London) on 92.4%. The comparison group includes Kilburn High Road (92.5%), Kensal Green (91.8%) and Anerley (93.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 53,536 | 92.4% | 2.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,023 | 87.9% | 1.4% |
| Period 6 of 2026-27 | 3,957 | 88.8% | 3.9% |
| Period 5 of 2026-27 | 3,772 | 93.1% | 4.1% |
| Period 4 of 2026-27 | 4,051 | 90.7% | 2.8% |
| Period 3 of 2026-27 | 3,922 | 93.6% | 1.9% |
| Period 2 of 2026-27 | 3,900 | 93.8% | 3.2% |
| Period 1 of 2026-27 | 4,221 | 94.6% | 1.7% |
| Period 13 of 2025-26 | 4,348 | 95.9% | 1.2% |
| Period 12 of 2025-26 | 4,088 | 93.0% | 2.8% |
| Period 11 of 2025-26 | 4,385 | 91.9% | 4.0% |
| Period 10 of 2025-26 | 4,839 | 92.6% | 4.4% |
| Period 9 of 2025-26 | 4,251 | 90.5% | 3.8% |
| Period 8 of 2025-26 | 3,779 | 94.8% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kilburn High Road | 53,533 | 92.5% | 3.1% |
| Kensal Green | 53,496 | 91.8% | 2.8% |
| Anerley | 53,178 | 93.6% | 7.3% |