London Overground had 50,840 scheduled stops at Anerley in the 13 periods to Period 7 of 2026-27, 96% of the station's total. 93.9% of recorded arrivals came within three minutes and 7.4% of stops were cancelled.
London Overground trains at Anerley also serve Penge West (0.6 km north-east, 92.0% on time, 4.5% cancelled), Crystal Palace (0.7 km north-west, 94.0% on time, 4.4% cancelled), Sydenham (London) (1.9 km north-east, 91.6% on time, 3.7% cancelled), Norwood Junction (1.9 km south, 90.5% on time, 7.2% cancelled), Forest Hill (3.0 km north, 91.1% on time, 3.7% cancelled) and Honor Oak Park (4.4 km north, 92.1% on time, 3.7% cancelled), which are the stations on its network closest to Anerley.
Within 30 km of here, London Overground runs best at Romford, 24.9 km north-east (99.7%), and worst at Finchley Road and Frognal, 17.3 km north-west (75.2%).
The busiest London Overground station within 30 km of Anerley is Highbury and Islington, 15.1 km north, with about 593 scheduled stops a day.
Of the 2 operators with enough records at Anerley, London Overground is the most punctual, at 93.9%.
For London Overground, Anerley is the 26th best of 111 ranked stations. Its 93.9% here is 4.5 percentage points above the 89.4% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,966 | 93.3% | 4.6% |
| Period 6 of 2026-27 | 3,684 | 92.3% | 9.1% |
| Period 5 of 2026-27 | 3,778 | 91.1% | 12.8% |
| Period 4 of 2026-27 | 3,840 | 94.0% | 12.4% |
| Period 3 of 2026-27 | 3,904 | 94.8% | 6.4% |
| Period 2 of 2026-27 | 3,804 | 94.5% | 5.8% |
| Period 1 of 2026-27 | 4,547 | 95.3% | 6.7% |
| Period 13 of 2025-26 | 4,060 | 95.5% | 4.7% |
| Period 12 of 2025-26 | 3,982 | 95.0% | 8.7% |
| Period 11 of 2025-26 | 3,837 | 93.4% | 8.7% |
| Period 10 of 2025-26 | 3,646 | 95.5% | 5.4% |
| Period 9 of 2025-26 | 3,956 | 92.8% | 6.7% |
| Period 8 of 2025-26 | 3,836 | 93.0% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Anerley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 2,338 | 87.2% | 4.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out