LNER at Alnmouth
How this operator is doing here
LNER had 7,859 scheduled stops at Alnmouth in the 13 periods to Period 7 of 2026-27, 40% of the station's total. 62.9% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
LNER trains at Alnmouth also serve Morpeth (25.7 km south, 69.4% on time, 1.6% cancelled), Newcastle (47.2 km south, 63.7% on time, 2.3% cancelled), Berwick-upon-Tweed (48.5 km north-west, 64.2% on time, 1.2% cancelled), Reston (61.7 km north-west, 87.0% on time, 0.9% cancelled), Durham (68.3 km south, 68.1% on time, 2.4% cancelled) and Dunbar (86.9 km north-west, 75.9% on time, 1.4% cancelled), which are the stations on its network closest to Alnmouth.
The busiest LNER station within 30 km of Alnmouth is Morpeth, 25.7 km south, with about 9 scheduled stops a day.
LNER ranks 3rd of the 4 operators with enough records at Alnmouth, on 62.9%.
For LNER, Alnmouth is the 27th best of 35 ranked stations. Its 62.9% here is 4.7 percentage points below the 67.6% across the whole network.
LNER at Alnmouth has slipped sharply. 62.9% of stops came within three minutes of the timetable in the latest 13 periods, 11.9 percentage points worse than the 74.8% recorded in the 13 before. Cancellations held steady at 1.7% of scheduled stops, against 1.7% before.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 533 | 58.4% | 0.4% |
| Period 6 of 2026-27 | 605 | 59.0% | 2.0% |
| Period 5 of 2026-27 | 628 | 58.9% | 1.8% |
| Period 4 of 2026-27 | 623 | 57.5% | 1.8% |
| Period 3 of 2026-27 | 628 | 61.0% | 1.9% |
| Period 2 of 2026-27 | 627 | 62.7% | 1.8% |
| Period 1 of 2026-27 | 717 | 58.9% | 1.8% |
| Period 13 of 2025-26 | 684 | 70.0% | 1.2% |
| Period 12 of 2025-26 | 629 | 64.9% | 1.6% |
| Period 11 of 2025-26 | 627 | 62.0% | 2.2% |
| Period 10 of 2025-26 | 537 | 62.7% | 1.1% |
| Period 9 of 2025-26 | 511 | 71.2% | 3.5% |
| Period 8 of 2025-26 | 510 | 72.5% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Alnmouth
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 5,360 | 71.3% | 1.8% |
| CrossCountry | 5,172 | 62.2% | 3.3% |
| Northern | 1,244 | 75.0% | 0.3% |
| Lumo (East Coast) | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out