CrossCountry at Alnmouth
How this operator is doing here
CrossCountry had 5,172 scheduled stops at Alnmouth in the 13 periods to Period 7 of 2026-27, 26% of the station's total. 62.2% of recorded arrivals came within three minutes and 3.3% of stops were cancelled.
CrossCountry trains at Alnmouth also serve Morpeth (25.7 km south, 64.6% on time, 3.2% cancelled), Newcastle (47.2 km south, 65.1% on time, 3.9% cancelled), Berwick-upon-Tweed (48.5 km north-west, 67.4% on time, 3.3% cancelled), Durham (68.3 km south, 64.2% on time, 3.8% cancelled), Dunbar (86.9 km north-west, 58.3% on time, 3.7% cancelled) and Darlington (97.1 km south, 66.1% on time, 3.7% cancelled), which are the stations on its network closest to Alnmouth.
The busiest CrossCountry station within 30 km of Alnmouth is Morpeth, 25.7 km south, with about 13 scheduled stops a day.
Of the 4 operators with enough records at Alnmouth, CrossCountry is the least punctual, at 62.2%.
For CrossCountry, Alnmouth is the 51st best of 99 ranked stations. Its 62.2% here is 1.0 percentage points below the 63.2% across the whole network.
CrossCountry at Alnmouth has slipped sharply. 62.2% of stops came within three minutes of the timetable in the latest 13 periods, 6.6 percentage points worse than the 68.8% recorded in the 13 before. Cancellations held steady at 3.3% of scheduled stops, against 3.2% before.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 341 | 59.7% | 3.2% |
| Period 6 of 2026-27 | 388 | 57.2% | 7.2% |
| Period 5 of 2026-27 | 400 | 58.5% | 1.5% |
| Period 4 of 2026-27 | 403 | 59.0% | 4.5% |
| Period 3 of 2026-27 | 397 | 62.2% | 4.8% |
| Period 2 of 2026-27 | 404 | 60.2% | 3.7% |
| Period 1 of 2026-27 | 464 | 58.0% | 1.5% |
| Period 13 of 2025-26 | 441 | 71.5% | 2.3% |
| Period 12 of 2025-26 | 379 | 62.7% | 1.1% |
| Period 11 of 2025-26 | 403 | 69.0% | 0.7% |
| Period 10 of 2025-26 | 367 | 61.4% | 4.6% |
| Period 9 of 2025-26 | 400 | 61.1% | 4.3% |
| Period 8 of 2025-26 | 385 | 67.3% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Alnmouth
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 7,859 | 62.9% | 1.7% |
| TransPennine Express | 5,360 | 71.3% | 1.8% |
| Northern | 1,244 | 75.0% | 0.3% |
| Lumo (East Coast) | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out