Northern at Alnmouth
How this operator is doing here
Northern had 1,244 scheduled stops at Alnmouth in the 13 periods to Period 7 of 2026-27, 6% of the station's total. 75.0% of recorded arrivals came within three minutes and 0.3% of stops were cancelled.
Northern trains at Alnmouth also serve Acklington (9.5 km south, 77.0% on time, 0.2% cancelled), Chathill (16.6 km north, 76.5% on time, 0.2% cancelled), Widdrington (16.8 km south, 66.5% on time, 0.2% cancelled), Ashington (23.7 km south, 82.1% on time, 2.6% cancelled), Pegswood (23.8 km south, 66.4% on time, 0.2% cancelled) and Morpeth (25.7 km south, 83.3% on time, 2.3% cancelled), which are the stations on its network closest to Alnmouth.
The busiest Northern station within 30 km of Alnmouth is Ashington, 23.7 km south, with about 58 scheduled stops a day.
Of the 4 operators with enough records at Alnmouth, Northern is the most punctual, at 75.0%.
For Northern, Alnmouth is the 367th best of 493 ranked stations. Its 75.0% here is 3.6 percentage points below the 78.6% across the whole network.
Northern cancels fewer trains at Alnmouth than elsewhere: 0.3% of scheduled stops, against 2.8% across its network and 2.1% for every operator at the station.
Northern at Alnmouth has not moved in one direction over three full railway years: 71.4% within three minutes in 2023-24, 78.0% in 2024-25 and 75.8% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 88 | 76.1% | 0.0% |
| Period 6 of 2026-27 | 92 | 74.4% | 2.2% |
| Period 5 of 2026-27 | 96 | 72.9% | 0.0% |
| Period 4 of 2026-27 | 96 | 80.2% | 0.0% |
| Period 3 of 2026-27 | 96 | 74.0% | 0.0% |
| Period 2 of 2026-27 | 96 | 78.1% | 0.0% |
| Period 1 of 2026-27 | 112 | 75.9% | 0.0% |
| Period 13 of 2025-26 | 104 | 80.8% | 0.0% |
| Period 12 of 2025-26 | 96 | 82.3% | 0.0% |
| Period 11 of 2025-26 | 92 | 75.8% | 1.1% |
| Period 10 of 2025-26 | 84 | 73.8% | 0.0% |
| Period 9 of 2025-26 | 96 | 62.1% | 1.0% |
| Period 8 of 2025-26 | 96 | 67.4% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Alnmouth
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 7,859 | 62.9% | 1.7% |
| TransPennine Express | 5,360 | 71.3% | 1.8% |
| CrossCountry | 5,172 | 62.2% | 3.3% |
| Lumo (East Coast) | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out