Cherry Tree
CYTNorth WestManaged by Northern Trains
How this station is performing
Cherry Tree had 12,498 scheduled stops to Period 7 of 2026-27, about 34 a day. 84.2% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Cherry Tree opened on 1 June 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Cherry Tree is the oldest; the next oldest, Mill Hill (Lancs), dates from 1846.
The nearest stations to Cherry Tree are Mill Hill (Lancs) (1.2 km east), Pleasington (1.7 km west), Blackburn (3.0 km north-east), Darwen (5.2 km south-east) and Ramsgreave and Wilpshire (5.9 km north-east). 9 stations lie within 10 km in all. Of the five, Pleasington is the most punctual at 85.2% and Darwen the least at 70.3%, with Cherry Tree on 84.2%.
Cherry Tree takes its name from a suburb called Cherry Tree, and the station stands 0.0 km from its centre.
For Cherry Tree, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 71.4% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2024-25, at 91.7%, which is 20.3 percentage points higher. Cancellations peaked at 8.6% of scheduled stops in Period 10 of 2023-24, against 3.0% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Cherry Tree on 84.2%. The comparison group includes Moorside (87.2%), Pleasington (85.2%) and Acton Bridge (Cheshire) (61.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,498 | 84.2% | 3.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 964 | 82.3% | 2.1% |
| Period 6 of 2026-27 | 964 | 87.9% | 1.0% |
| Period 5 of 2026-27 | 968 | 84.3% | 3.0% |
| Period 4 of 2026-27 | 964 | 82.9% | 4.4% |
| Period 3 of 2026-27 | 951 | 85.3% | 4.2% |
| Period 2 of 2026-27 | 968 | 85.8% | 4.5% |
| Period 1 of 2026-27 | 1,116 | 88.8% | 3.5% |
| Period 13 of 2025-26 | 1,054 | 89.0% | 2.4% |
| Period 12 of 2025-26 | 960 | 86.2% | 1.8% |
| Period 11 of 2025-26 | 950 | 88.9% | 1.3% |
| Period 10 of 2025-26 | 868 | 86.5% | 5.4% |
| Period 9 of 2025-26 | 912 | 71.4% | 2.9% |
| Period 8 of 2025-26 | 859 | 72.4% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Moorside | 12,498 | 87.2% | 4.1% |
| Pleasington | 12,498 | 85.2% | 3.0% |
| Acton Bridge (Cheshire) | 12,512 | 61.3% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out