How this station is performing
Pleasington had 12,498 scheduled stops to Period 7 of 2026-27, about 34 a day. 85.2% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Pleasington opened on 1 June 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Pleasington is the oldest; the next oldest, Cherry Tree, dates from 1846.
The nearest stations to Pleasington are Cherry Tree (1.7 km east), Mill Hill (Lancs) (2.9 km east), Blackburn (4.6 km east), Darwen (6.4 km south-east) and Ramsgreave and Wilpshire (7.0 km north-east). 9 stations lie within 10 km in all. At 85.2%, Pleasington is more punctual than every one of them; the best of the five, Mill Hill (Lancs), manages 84.9%.
Pleasington takes its name from a Village called Pleasington, home to about 482 people, and the station stands 0.3 km from its centre.
For Pleasington, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 73.2% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2024-25, at 93.1%, which is 19.9 percentage points higher. Cancellations peaked at 8.5% of scheduled stops in Period 10 of 2023-24, against 3.0% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Pleasington on 85.2%. The comparison group includes Cherry Tree (84.2%), Moorside (87.2%) and Acton Bridge (Cheshire) (61.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,498 | 85.2% | 3.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 964 | 83.4% | 2.1% |
| Period 6 of 2026-27 | 964 | 88.3% | 1.0% |
| Period 5 of 2026-27 | 968 | 86.2% | 3.0% |
| Period 4 of 2026-27 | 964 | 84.1% | 4.4% |
| Period 3 of 2026-27 | 951 | 85.9% | 4.2% |
| Period 2 of 2026-27 | 968 | 86.8% | 4.5% |
| Period 1 of 2026-27 | 1,116 | 89.2% | 3.5% |
| Period 13 of 2025-26 | 1,054 | 89.3% | 2.4% |
| Period 12 of 2025-26 | 960 | 88.1% | 1.8% |
| Period 11 of 2025-26 | 950 | 90.8% | 1.3% |
| Period 10 of 2025-26 | 868 | 86.6% | 5.4% |
| Period 9 of 2025-26 | 912 | 73.2% | 3.0% |
| Period 8 of 2025-26 | 859 | 73.7% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cherry Tree | 12,498 | 84.2% | 3.0% |
| Moorside | 12,498 | 87.2% | 4.1% |
| Acton Bridge (Cheshire) | 12,512 | 61.3% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out