Moorside
MSDNorth WestManaged by Northern Trains
How this station is performing
Moorside had 12,498 scheduled stops to Period 7 of 2026-27, about 34 a day. 87.2% of recorded arrivals were within three minutes of the timetable and 4.1% of scheduled stops were cancelled.
Moorside opened on 2 July 1888, 138 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Moorside is the newest; the oldest, Patricroft, opened in 1830.
The nearest stations to Moorside are Swinton (Manchester) (1.0 km east), Clifton (Manchester) (2.6 km east), Walkden (2.9 km west), Kearsley (Manchester) (3.4 km north-west) and Patricroft (3.5 km south). 23 stations lie within 10 km in all. At 87.2%, Moorside is more punctual than every one of them; the best of the five, Walkden, manages 84.2%.
Across the whole run of data, the weakest four-week period for Moorside was Period 9 of 2023-24, at 75.1%, some time before the latest year. The strongest was Period 1 of 2023-24, at 94.6%, and the two are 19.5 percentage points apart. Cancellations peaked at 10.1% of scheduled stops in Period 9 of 2024-25, against 4.1% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Moorside is the most punctual, at 87.2%. The comparison group includes Cherry Tree (84.2%), Pleasington (85.2%) and Acton Bridge (Cheshire) (61.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,498 | 87.2% | 4.1% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 954 | 85.3% | 1.6% |
| Period 6 of 2026-27 | 950 | 89.0% | 1.9% |
| Period 5 of 2026-27 | 952 | 91.3% | 4.7% |
| Period 4 of 2026-27 | 922 | 87.3% | 4.7% |
| Period 3 of 2026-27 | 836 | 87.8% | 4.4% |
| Period 2 of 2026-27 | 953 | 82.1% | 4.5% |
| Period 1 of 2026-27 | 1,105 | 91.6% | 2.2% |
| Period 13 of 2025-26 | 1,052 | 91.0% | 4.7% |
| Period 12 of 2025-26 | 952 | 89.0% | 2.4% |
| Period 11 of 2025-26 | 958 | 88.4% | 6.4% |
| Period 10 of 2025-26 | 874 | 86.3% | 5.9% |
| Period 9 of 2025-26 | 1,010 | 81.4% | 5.7% |
| Period 8 of 2025-26 | 980 | 83.1% | 5.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cherry Tree | 12,498 | 84.2% | 3.0% |
| Pleasington | 12,498 | 85.2% | 3.0% |
| Acton Bridge (Cheshire) | 12,512 | 61.3% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out