Southeastern at Abbey Wood
How this operator is doing here
Southeastern had 56,258 scheduled stops at Abbey Wood in the 13 periods to Period 7 of 2026-27, 29% of the station's total. 92.0% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
Southeastern trains at Abbey Wood also serve Belvedere (2.3 km east, 92.6% on time, 1.6% cancelled), Plumstead (2.5 km west, 90.9% on time, 1.6% cancelled), Welling (3.1 km south-west, 86.0% on time, 2.0% cancelled), Bexleyheath (3.2 km south, 84.1% on time, 2.0% cancelled), Woolwich Arsenal (3.5 km west, 90.2% on time, 1.6% cancelled) and Erith (3.9 km east, 92.2% on time, 1.6% cancelled), which are the stations on its network closest to Abbey Wood.
Within 30 km of here, Southeastern runs best at Sundridge Park, 10.9 km south-west (99.4%), and worst at Sevenoaks, 24.2 km south (72.3%).
The busiest Southeastern station within 30 km of Abbey Wood is London Bridge, 14.3 km west, with about 912 scheduled stops a day.
Southeastern ranks 2nd of the 3 operators with enough records at Abbey Wood, on 92.0%.
For Southeastern, Abbey Wood is the 26th best of 173 ranked stations. Its 92.0% here is 7.8 percentage points above the 84.2% across the whole network.
Over three full railway years Southeastern at Abbey Wood has improved each time, from 85.2% within three minutes in 2023-24 to 91.9% in 2024-25 and 92.6% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,378 | 92.9% | 0.9% |
| Period 6 of 2026-27 | 4,360 | 92.1% | 0.8% |
| Period 5 of 2026-27 | 4,334 | 92.7% | 2.2% |
| Period 4 of 2026-27 | 4,389 | 92.5% | 1.6% |
| Period 3 of 2026-27 | 3,946 | 89.1% | 4.0% |
| Period 2 of 2026-27 | 4,207 | 91.2% | 2.5% |
| Period 1 of 2026-27 | 5,026 | 92.0% | 1.4% |
| Period 13 of 2025-26 | 4,797 | 91.2% | 1.1% |
| Period 12 of 2025-26 | 4,388 | 91.3% | 1.3% |
| Period 11 of 2025-26 | 4,238 | 94.1% | 1.2% |
| Period 10 of 2025-26 | 3,721 | 94.0% | 0.8% |
| Period 9 of 2025-26 | 4,311 | 91.1% | 1.1% |
| Period 8 of 2025-26 | 4,163 | 91.6% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Abbey Wood
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 113,999 | 94.9% | 2.5% |
| GTR | 22,343 | 86.0% | 6.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out