Falkirk High
FKKScotlandManaged by ScotRail
How this station is performing
Falkirk High had 33,214 scheduled stops to Period 7 of 2026-27, about 91 a day. 93.3% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Falkirk High opened on 21 February 1842, 184 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Falkirk High is the oldest; the next oldest, Polmont, dates from 1842.
The nearest stations to Falkirk High are Falkirk Grahamston (1.2 km north), Camelon (2.3 km north-west), Larbert (4.1 km north-west), Polmont (4.9 km east) and Blackridge (12.2 km south). 4 stations lie within 10 km in all. Of the five, Camelon is the most punctual at 93.8% and Blackridge the least at 89.1%, with Falkirk High on 93.3%.
Falkirk High is named after Falkirk, a town, home to about 35,850 people, but the station stands 1.0 km from its centre.
2 operators call at Falkirk High: ScotRail (93.4%, 98% of stops) and Lumo (East Coast) (87.0%, 2% of stops). The operator you travel with matters: ScotRail reaches 93.4% within three minutes while Lumo (East Coast) manages 87.0%, a gap of 6.4 percentage points.
Compared with 3 stations of a similar size in Scotland, Falkirk High is the most punctual, at 93.3%. The comparison group includes Dalmeny (81.0%), North Queensferry (82.9%) and Whifflet (79.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 32,527 | 93.4% | 1.2% |
| Lumo (East Coast) | 687 | 87.0% | 17.8% |
Operators with their own page for this station are linked to it.
Late train at Falkirk High? Delay Repay
These operators call at Falkirk High and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,575 | 93.0% | 0.7% |
| Period 6 of 2026-27 | 2,630 | 93.9% | 1.4% |
| Period 5 of 2026-27 | 2,619 | 93.6% | 1.6% |
| Period 4 of 2026-27 | 2,261 | 92.5% | 3.1% |
| Period 3 of 2026-27 | 2,583 | 93.3% | 2.8% |
| Period 2 of 2026-27 | 2,581 | 95.0% | 2.1% |
| Period 1 of 2026-27 | 2,913 | 94.0% | 2.0% |
| Period 13 of 2025-26 | 2,845 | 95.0% | 1.4% |
| Period 12 of 2025-26 | 2,589 | 95.4% | 1.0% |
| Period 11 of 2025-26 | 2,320 | 92.4% | 0.9% |
| Period 10 of 2025-26 | 2,254 | 93.2% | 0.9% |
| Period 9 of 2025-26 | 2,522 | 90.3% | 0.9% |
| Period 8 of 2025-26 | 2,522 | 90.2% | 0.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dalmeny | 33,129 | 81.0% | 1.6% |
| North Queensferry | 33,129 | 82.9% | 1.6% |
| Whifflet | 32,938 | 79.4% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out