Ilkley
ILKYorkshire and The HumberManaged by Northern Trains
How this station is performing
Ilkley had 42,737 scheduled stops to Period 7 of 2026-27, about 117 a day. 92.0% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Ilkley opened on 1 August 1865, 161 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Keighley is the oldest (1847) and Crossflatts the newest (1982), with Ilkley in between.
The nearest stations to Ilkley are Ben Rhydding (1.6 km east), Burley-in-Wharfedale (4.8 km south-east), Menston (6.7 km south-east), Crossflatts (7.5 km south) and Keighley (8.2 km south-west). 10 stations lie within 10 km in all. At 92.0%, Ilkley is more punctual than every one of them; the best of the five, Menston, manages 88.5%.
Ilkley takes its name from a town called Ilkley, home to about 24,954 people, and the station stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Ilkley was Period 9 of 2023-24, at 75.8%, some time before the latest year. The strongest was Period 1 of 2025-26, at 96.8%, and the two are 21.0 percentage points apart. Cancellations peaked at 8.6% of scheduled stops in Period 10 of 2023-24, against 1.3% over the latest 13 periods.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Ilkley is the most punctual, at 92.0%. The comparison group includes Ben Rhydding (86.0%), Burley-in-Wharfedale (86.3%) and Menston (88.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 42,737 | 92.0% | 1.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,282 | 95.4% | 0.2% |
| Period 6 of 2026-27 | 3,284 | 93.5% | 1.5% |
| Period 5 of 2026-27 | 3,217 | 95.0% | 1.5% |
| Period 4 of 2026-27 | 2,947 | 93.7% | 1.6% |
| Period 3 of 2026-27 | 3,272 | 94.2% | 2.4% |
| Period 2 of 2026-27 | 3,284 | 92.1% | 0.9% |
| Period 1 of 2026-27 | 3,754 | 92.2% | 1.9% |
| Period 13 of 2025-26 | 3,597 | 94.4% | 0.2% |
| Period 12 of 2025-26 | 3,280 | 93.1% | 0.6% |
| Period 11 of 2025-26 | 3,284 | 90.1% | 1.1% |
| Period 10 of 2025-26 | 2,978 | 88.5% | 1.1% |
| Period 9 of 2025-26 | 3,274 | 84.8% | 1.8% |
| Period 8 of 2025-26 | 3,284 | 88.6% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ben Rhydding | 42,737 | 86.0% | 1.4% |
| Burley-in-Wharfedale | 42,737 | 86.3% | 1.4% |
| Menston | 42,737 | 88.5% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out