Guiseley
GSYYorkshire and The HumberManaged by Northern Trains
How this station is performing
Guiseley had 42,743 scheduled stops to Period 7 of 2026-27, about 117 a day. 90.1% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Guiseley opened on 1 August 1865, 161 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Apperley Bridge is the oldest (1846) and Baildon the newest (1876), with Guiseley in between.
The nearest stations to Guiseley are Menston (2.2 km north-west), Apperley Bridge (3.8 km south), Baildon (3.8 km south-west), Burley-in-Wharfedale (4.4 km north-west) and Shipley (Yorks) (6.1 km south-west). 17 stations lie within 10 km in all. Of the five, Baildon is the most punctual at 90.2% and Burley-in-Wharfedale the least at 86.3%, with Guiseley on 90.1%.
Guiseley takes its name from a town called Guiseley, home to about 64,000 people, and the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Guiseley was Period 9 of 2023-24, at 69.9%, some time before the latest year. The strongest was Period 7 of 2026-27, at 94.0%, and the two are 24.1 percentage points apart. Cancellations peaked at 8.7% of scheduled stops in Period 10 of 2023-24, against 1.3% over the latest 13 periods.
1 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Guiseley on 90.1%. The comparison group includes Ben Rhydding (86.0%), Burley-in-Wharfedale (86.3%) and Ilkley (92.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 42,743 | 90.1% | 1.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,282 | 94.0% | 0.2% |
| Period 6 of 2026-27 | 3,284 | 92.1% | 1.5% |
| Period 5 of 2026-27 | 3,217 | 93.8% | 1.5% |
| Period 4 of 2026-27 | 2,951 | 94.0% | 1.7% |
| Period 3 of 2026-27 | 3,272 | 90.9% | 2.3% |
| Period 2 of 2026-27 | 3,284 | 91.1% | 1.0% |
| Period 1 of 2026-27 | 3,754 | 91.5% | 2.0% |
| Period 13 of 2025-26 | 3,596 | 93.6% | 0.3% |
| Period 12 of 2025-26 | 3,283 | 91.7% | 0.6% |
| Period 11 of 2025-26 | 3,284 | 89.3% | 1.0% |
| Period 10 of 2025-26 | 2,978 | 85.5% | 1.0% |
| Period 9 of 2025-26 | 3,274 | 79.1% | 1.7% |
| Period 8 of 2025-26 | 3,284 | 83.7% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ben Rhydding | 42,737 | 86.0% | 1.4% |
| Burley-in-Wharfedale | 42,737 | 86.3% | 1.4% |
| Ilkley | 42,737 | 92.0% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out