Slaithwaite
SWTYorkshire and The HumberManaged by Northern Trains
How this station is performing
Slaithwaite had 15,435 scheduled stops to Period 7 of 2026-27, about 42 a day. 64.5% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Slaithwaite opened on 1 August 1849 and closed to passengers on 7 October 1968. It reopened on 13 December 1982, 44 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Huddersfield is the oldest (1847) and Honley the newest (1850), with Slaithwaite in between.
The nearest stations to Slaithwaite are Marsden (Yorks) (4.0 km south-west), Lockwood (5.4 km east), Berry Brow (5.8 km east), Honley (6.8 km east) and Huddersfield (6.8 km north-east). 8 stations lie within 10 km in all. At 64.5%, Slaithwaite is less punctual than all of them; the best of the five, Lockwood, manages 85.6%.
Slaithwaite takes its name from a Village called Slaithwaite, and the station stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Slaithwaite was Period 9 of 2023-24, at 38.9%, some time before the latest year. The strongest was Period 2 of 2026-27, at 82.2%, and the two are 43.3 percentage points apart. Cancellations peaked at 6.4% of scheduled stops in Period 11 of 2025-26, against 2.9% over the latest 13 periods.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Slaithwaite is the least punctual, at 64.5%. All of them are ahead, including Moorthorpe (75.0%), Mexborough (81.1%) and Conisbrough (82.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 15,435 | 64.5% | 2.9% |
Operators with their own page for this station are linked to it.
Late train at Slaithwaite? Delay Repay
These operators call at Slaithwaite and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 567 | 54.6% | 2.1% |
| Period 6 of 2026-27 | 1,287 | 61.3% | 3.2% |
| Period 5 of 2026-27 | 1,201 | 54.8% | 5.4% |
| Period 4 of 2026-27 | 1,018 | 52.2% | 2.7% |
| Period 3 of 2026-27 | 1,269 | 81.3% | 2.8% |
| Period 2 of 2026-27 | 1,038 | 82.2% | 2.7% |
| Period 1 of 2026-27 | 1,189 | 65.0% | 2.2% |
| Period 13 of 2025-26 | 1,462 | 69.7% | 1.2% |
| Period 12 of 2025-26 | 1,168 | 67.5% | 1.5% |
| Period 11 of 2025-26 | 1,207 | 70.3% | 6.4% |
| Period 10 of 2025-26 | 1,257 | 67.1% | 1.6% |
| Period 9 of 2025-26 | 1,350 | 47.7% | 2.9% |
| Period 8 of 2025-26 | 1,422 | 60.9% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Moorthorpe | 15,407 | 75.0% | 2.2% |
| Mexborough | 15,108 | 81.1% | 2.6% |
| Conisbrough | 15,107 | 82.3% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out