Yate
YAESouth WestManaged by Great Western Railway
How this station is performing
Yate had 21,318 scheduled stops to Period 7 of 2026-27, about 59 a day. 77.5% of recorded arrivals were within three minutes of the timetable and 5.5% of scheduled stops were cancelled.
Yate opened on 8 July 1844 and closed to passengers on 4 January 1965. It reopened on 15 May 1989, 37 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Yate is the oldest; the next oldest, Patchway, dates from 1863.
The nearest stations to Yate are Bristol Parkway (8.3 km west), Patchway (9.2 km west), Filton Abbey Wood (10.0 km south-west), Ashley Down (12.2 km south-west) and Stapleton Road (12.4 km south-west). 2 stations lie within 10 km in all. Of the five, Ashley Down is the most punctual at 84.7% and Bristol Parkway the least at 66.2%, with Yate on 77.5%.
Yate takes its name from a town called Yate, home to about 23,701 people, and the station stands 0.9 km from its centre.
Cancellations are a particular problem at Yate. 5.5% of scheduled stops did not happen, 2.0 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2199th of 2,374.
1 of 3 stations of a similar size in South West are more punctual than Yate on 77.5%. The comparison group includes Camborne (67.3%), Crediton (79.0%) and Redruth (69.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 21,317 | 77.5% | 5.5% |
| CrossCountry | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Yate? Delay Repay
These operators call at Yate and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,639 | 76.9% | 4.6% |
| Period 6 of 2026-27 | 1,639 | 70.8% | 9.3% |
| Period 5 of 2026-27 | 1,627 | 70.7% | 8.4% |
| Period 4 of 2026-27 | 1,636 | 72.9% | 7.2% |
| Period 3 of 2026-27 | 1,626 | 77.7% | 8.5% |
| Period 2 of 2026-27 | 1,640 | 76.8% | 4.8% |
| Period 1 of 2026-27 | 1,713 | 84.5% | 1.6% |
| Period 13 of 2025-26 | 1,788 | 83.8% | 3.2% |
| Period 12 of 2025-26 | 1,641 | 86.3% | 3.7% |
| Period 11 of 2025-26 | 1,640 | 85.0% | 2.7% |
| Period 10 of 2025-26 | 1,473 | 75.7% | 4.9% |
| Period 9 of 2025-26 | 1,616 | 66.3% | 8.8% |
| Period 8 of 2025-26 | 1,640 | 77.0% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out