Redruth
REDSouth WestManaged by Great Western Railway
How this station is performing
Redruth has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 21,641 scheduled stops, about 60 a day. In those periods 69.2% of stops arrived within three minutes of the timetable and 6.4% of scheduled stops were cancelled.
Redruth opened on 23 May 1843. It was moved to the site it uses now on 25 August 1852. Of the 5 stations nearest to it with a known opening date, Redruth is the oldest; the next oldest, Camborne, dates from 1843.
The nearest stations to Redruth are Camborne (5.7 km south-west), Perranwell (8.3 km east), Penryn (Cornwall) (10.7 km south-east), Truro (12.0 km east) and Penmere (13.7 km south-east). 2 stations lie within 10 km in all. Of the five, Penryn (Cornwall) is the most punctual at 88.3% and Camborne the least at 67.3%, with Redruth on 69.2%.
Redruth takes its name from a town called Redruth, home to about 15,626 people, and the station stands 0.1 km from its centre.
2 operators call at Redruth: Great Western Railway (70.0%, 93% of stops) and CrossCountry (58.9%, 7% of stops). The operator you travel with matters: Great Western Railway reaches 70.0% within three minutes while CrossCountry manages 58.9%, a gap of 11.1 percentage points.
Compared with 3 stations of a similar size in South West, Redruth is the least punctual, at 69.2%. All of them are ahead, including Oldfield Park (74.9%), Yate (77.5%) and Hamworthy (70.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 20,196 | 70.0% | 5.9% |
| CrossCountry | 1,445 | 58.9% | 14.1% |
Operators with their own page for this station are linked to it.
Late train at Redruth? Delay Repay
These operators call at Redruth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,587 | 78.2% | 3.2% |
| Period 6 of 2026-27 | 1,641 | 72.5% | 8.3% |
| Period 5 of 2026-27 | 1,687 | 59.3% | 11.6% |
| Period 4 of 2026-27 | 1,700 | 63.2% | 9.1% |
| Period 3 of 2026-27 | 1,687 | 65.9% | 8.4% |
| Period 2 of 2026-27 | 1,690 | 68.4% | 5.8% |
| Period 1 of 2026-27 | 1,928 | 75.0% | 2.7% |
| Period 13 of 2025-26 | 1,837 | 77.1% | 3.2% |
| Period 12 of 2025-26 | 1,667 | 65.4% | 2.7% |
| Period 11 of 2025-26 | 1,681 | 73.1% | 10.8% |
| Period 10 of 2025-26 | 1,491 | 63.3% | 8.5% |
| Period 9 of 2025-26 | 1,353 | – | 7.1% |
| Period 8 of 2025-26 | 1,692 | 64.4% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Oldfield Park | 21,842 | 74.9% | 4.5% |
| Yate | 21,318 | 77.5% | 5.5% |
| Hamworthy | 22,002 | 70.7% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out