Worthing
WRHSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Worthing had 70,306 scheduled stops to Period 7 of 2026-27, about 193 a day. 77.6% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Worthing opened on 24 November 1845, 181 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Worthing is the oldest; the next oldest, Lancing, dates from 1845.
The nearest stations to Worthing are West Worthing (1.2 km west), East Worthing (1.5 km east), Durrington-on-Sea (2.5 km west), Lancing (3.8 km east) and Goring-by-Sea (4.0 km west). 8 stations lie within 10 km in all. At 77.6%, Worthing is less punctual than all of them; the best of the five, East Worthing, manages 83.5%.
Worthing is one of 4 stations named after a town called Worthing, home to about 109,120 people; this one stands 0.6 km from its centre.
For Worthing, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 69.7% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 87.4%, which is 17.7 percentage points higher.
2 of 3 stations of a similar size in South East are more punctual than Worthing on 77.6%. The comparison group includes Chichester (76.9%), Aldershot (90.7%) and Shoreham-by-Sea (78.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 70,306 | 77.6% | 3.2% |
Operators with their own page for this station are linked to it.
Late train at Worthing? Delay Repay
These operators call at Worthing and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,365 | 71.1% | 4.0% |
| Period 6 of 2026-27 | 5,408 | 69.7% | 3.4% |
| Period 5 of 2026-27 | 5,405 | 72.8% | 2.9% |
| Period 4 of 2026-27 | 5,434 | 78.0% | 1.9% |
| Period 3 of 2026-27 | 5,305 | 75.4% | 3.3% |
| Period 2 of 2026-27 | 5,349 | 78.6% | 6.3% |
| Period 1 of 2026-27 | 6,125 | 82.4% | 2.9% |
| Period 13 of 2025-26 | 5,779 | 84.1% | 3.7% |
| Period 12 of 2025-26 | 5,483 | 82.4% | 2.3% |
| Period 11 of 2025-26 | 5,318 | 83.6% | 3.2% |
| Period 10 of 2025-26 | 4,807 | 79.6% | 1.9% |
| Period 9 of 2025-26 | 5,305 | 72.6% | 3.1% |
| Period 8 of 2025-26 | 5,223 | 77.8% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chichester | 70,144 | 76.9% | 3.3% |
| Aldershot | 70,543 | 90.7% | 2.1% |
| Shoreham-by-Sea | 70,032 | 78.5% | 4.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out