Shoreham-by-Sea
SSESouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Shoreham-by-Sea had 70,032 scheduled stops to Period 7 of 2026-27, about 192 a day. 78.5% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Shoreham-by-Sea opened on 12 May 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Shoreham-by-Sea is the oldest; the next oldest, Southwick, dates from 1840.
The nearest stations to Shoreham-by-Sea are Southwick (2.4 km east), Fishersgate (3.7 km east), Lancing (3.7 km west), Portslade (4.7 km east) and East Worthing (6.0 km west). 13 stations lie within 10 km in all. At 78.5%, Shoreham-by-Sea is less punctual than all of them; the best of the five, Fishersgate, manages 84.7%.
Shoreham-by-Sea takes its name from a town called Shoreham-by-Sea, home to about 20,547 people, and the station stands 0.3 km from its centre.
The time of year matters a great deal for Shoreham-by-Sea. Averaged over every railway year in the data, period 9 (late November and December) is the weakest at 73.8%, while period 13 (March) is the strongest at 84.3%, a spread of 10.5 percentage points.
1 of 3 stations of a similar size in South East are more punctual than Shoreham-by-Sea on 78.5%. The comparison group includes Weybridge (83.0%), Chichester (76.9%) and Worthing (77.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 70,032 | 78.5% | 4.5% |
Operators with their own page for this station are linked to it.
Late train at Shoreham-by-Sea? Delay Repay
These operators call at Shoreham-by-Sea and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,339 | 72.7% | 4.9% |
| Period 6 of 2026-27 | 5,376 | 71.7% | 5.2% |
| Period 5 of 2026-27 | 5,377 | 73.9% | 4.4% |
| Period 4 of 2026-27 | 5,406 | 78.8% | 3.4% |
| Period 3 of 2026-27 | 5,278 | 76.2% | 4.6% |
| Period 2 of 2026-27 | 5,349 | 78.9% | 7.6% |
| Period 1 of 2026-27 | 6,125 | 83.2% | 4.3% |
| Period 13 of 2025-26 | 5,752 | 85.2% | 4.6% |
| Period 12 of 2025-26 | 5,457 | 83.5% | 3.2% |
| Period 11 of 2025-26 | 5,318 | 83.4% | 3.8% |
| Period 10 of 2025-26 | 4,781 | 80.3% | 3.1% |
| Period 9 of 2025-26 | 5,304 | 73.6% | 5.2% |
| Period 8 of 2025-26 | 5,170 | 78.4% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Weybridge | 69,921 | 83.0% | 3.6% |
| Chichester | 70,144 | 76.9% | 3.3% |
| Worthing | 70,306 | 77.6% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out