Chichester
CCHSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Chichester had 70,144 scheduled stops to Period 7 of 2026-27, about 193 a day. 76.9% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Chichester opened on 8 June 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Chichester is the oldest; the next oldest, Bosham, dates from 1847.
The nearest stations to Chichester are Fishbourne (Sussex) (2.5 km west), Bosham (4.7 km west), Nutbourne (7.3 km west), Bognor Regis (8.9 km south-east) and Southbourne (9.0 km west). 6 stations lie within 10 km in all. Of the five, Bognor Regis is the most punctual at 89.2% and Bosham the least at 71.6%, with Chichester on 76.9%.
Chichester takes its name from a city called Chichester, home to about 30,925 people, and the station stands 0.5 km from its centre.
Chichester has slipped a little, from 81.0% within three minutes in the previous 13 periods to 76.9% in the latest 13, a fall of 4.1 percentage points. Cancellations rose to 3.3% of scheduled stops from 2.8%, which is 0.5 percentage points more.
Compared with 3 stations of a similar size in South East, Chichester is the least punctual, at 76.9%. All of them are ahead, including Shoreham-by-Sea (78.5%), Worthing (77.6%) and Weybridge (83.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 70,144 | 76.9% | 3.3% |
Operators with their own page for this station are linked to it.
Late train at Chichester? Delay Repay
These operators call at Chichester and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,445 | 70.4% | 2.7% |
| Period 6 of 2026-27 | 4,822 | 69.9% | 3.4% |
| Period 5 of 2026-27 | 5,451 | 69.8% | 3.0% |
| Period 4 of 2026-27 | 5,486 | 76.9% | 2.6% |
| Period 3 of 2026-27 | 5,258 | 76.8% | 4.2% |
| Period 2 of 2026-27 | 5,289 | 79.6% | 5.5% |
| Period 1 of 2026-27 | 6,169 | 82.1% | 2.9% |
| Period 13 of 2025-26 | 5,855 | 82.5% | 3.1% |
| Period 12 of 2025-26 | 5,177 | 79.9% | 2.5% |
| Period 11 of 2025-26 | 5,499 | 82.0% | 4.1% |
| Period 10 of 2025-26 | 4,827 | 76.1% | 3.3% |
| Period 9 of 2025-26 | 5,452 | 73.5% | 3.2% |
| Period 8 of 2025-26 | 5,414 | 78.3% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Shoreham-by-Sea | 70,032 | 78.5% | 4.5% |
| Worthing | 70,306 | 77.6% | 3.2% |
| Weybridge | 69,921 | 83.0% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out