Worksop
WRKEast MidlandsManaged by Northern Trains
How this station is performing
Worksop had 25,133 scheduled stops to Period 7 of 2026-27, about 69 a day. 83.5% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Worksop opened on 17 July 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Worksop is the oldest; the next oldest, Shireoaks, dates from 1849.
The nearest stations to Worksop are Shireoaks (3.4 km north-west), Whitwell (Derbyshire) (6.2 km south-west), Creswell (8.1 km south-west), Kiveton Park (8.3 km west) and Kiveton Bridge (10.1 km west). 4 stations lie within 10 km in all. Of the five, Kiveton Bridge is the most punctual at 83.9% and Shireoaks the least at 82.5%, with Worksop on 83.5%.
Worksop takes its name from a market town called Worksop, home to about 44,733 people, and the station stands 0.2 km from its centre.
2 operators call at Worksop: Northern (81.4%, 58% of stops) and East Midlands Railway (86.5%, 42% of stops). The operator you travel with matters: East Midlands Railway reaches 86.5% within three minutes while Northern manages 81.4%, a gap of 5.1 percentage points.
1 of 3 stations of a similar size in East Midlands are more punctual than Worksop on 83.5%. The comparison group includes Corby (83.8%), Wellingborough (79.2%) and Long Buckby (73.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 14,520 | 81.4% | 2.0% |
| East Midlands Railway | 10,613 | 86.5% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Worksop? Delay Repay
These operators call at Worksop and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,936 | 82.4% | 1.9% |
| Period 6 of 2026-27 | 1,935 | 85.2% | 2.3% |
| Period 5 of 2026-27 | 1,926 | 79.8% | 3.4% |
| Period 4 of 2026-27 | 1,856 | 85.4% | 4.4% |
| Period 3 of 2026-27 | 1,882 | 80.6% | 2.7% |
| Period 2 of 2026-27 | 1,944 | 83.4% | 4.5% |
| Period 1 of 2026-27 | 2,240 | 85.8% | 2.1% |
| Period 13 of 2025-26 | 2,118 | 87.8% | 2.5% |
| Period 12 of 2025-26 | 1,717 | 83.2% | 2.0% |
| Period 11 of 2025-26 | 1,934 | 83.9% | 2.0% |
| Period 10 of 2025-26 | 1,765 | 85.7% | 3.5% |
| Period 9 of 2025-26 | 1,936 | 78.7% | 2.2% |
| Period 8 of 2025-26 | 1,944 | 83.5% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Corby | 24,525 | 83.8% | 8.1% |
| Wellingborough | 26,306 | 79.2% | 6.1% |
| Long Buckby | 26,480 | 73.7% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out