Long Buckby
LBKEast MidlandsManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Long Buckby had 26,480 scheduled stops to Period 7 of 2026-27, about 73 a day. 73.7% of recorded arrivals were within three minutes of the timetable and 5.0% of scheduled stops were cancelled.
Long Buckby opened on 1 December 1881, 145 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Long Buckby is the newest; the oldest, Rugby, opened in 1838.
Long Buckby is remote: its nearest neighbours are Northampton (13.8 km south-east), Rugby (14.6 km north-west), Market Harborough (23.9 km north-east), Kettering (26.5 km north-east) and Wellingborough (27.9 km east). Of the five, Wellingborough is the most punctual at 79.2% and Market Harborough the least at 59.5%, with Long Buckby on 73.7%.
Long Buckby takes its name from a Village called Long Buckby, home to about 4,518 people, and the station stands 0.8 km from its centre.
Cancellations are a particular problem at Long Buckby. 5.0% of scheduled stops did not happen, 1.9 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2119th of 2,374.
Compared with 3 stations of a similar size in East Midlands, Long Buckby is the least punctual, at 73.7%. All of them are ahead, including Wellingborough (79.2%), Retford (75.3%) and Worksop (83.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 26,480 | 73.7% | 5.0% |
Operators with their own page for this station are linked to it.
Late train at Long Buckby? Delay Repay
These operators call at Long Buckby and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,064 | 72.0% | 4.7% |
| Period 6 of 2026-27 | 2,023 | 68.1% | 7.7% |
| Period 5 of 2026-27 | 2,065 | 71.8% | 8.8% |
| Period 4 of 2026-27 | 1,915 | 67.1% | 8.1% |
| Period 3 of 2026-27 | 1,938 | 75.9% | 5.0% |
| Period 2 of 2026-27 | 1,930 | 73.3% | 6.9% |
| Period 1 of 2026-27 | 2,369 | 80.8% | 1.6% |
| Period 13 of 2025-26 | 2,219 | 80.3% | 2.0% |
| Period 12 of 2025-26 | 2,065 | 78.1% | 2.7% |
| Period 11 of 2025-26 | 1,990 | 77.5% | 3.7% |
| Period 10 of 2025-26 | 1,833 | 70.6% | 4.9% |
| Period 9 of 2025-26 | 2,001 | 69.2% | 4.7% |
| Period 8 of 2025-26 | 2,068 | 70.4% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Wellingborough | 26,306 | 79.2% | 6.1% |
| Retford | 27,004 | 75.3% | 2.4% |
| Worksop | 25,133 | 83.5% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out