East Midlands Railway had 10,613 scheduled stops at Worksop in the 13 periods to Period 7 of 2026-27, 42% of the station's total. 86.5% of recorded arrivals came within three minutes and 3.6% of stops were cancelled.
East Midlands Railway trains at Worksop also serve Whitwell (Derbyshire) (6.2 km south-west, – on time, 3.7% cancelled), Creswell (8.1 km south-west, – on time, 3.6% cancelled), Langwith-Whaley Thorns (10.5 km south-west, – on time, 3.7% cancelled), Shirebrook (13.1 km south-west, – on time, 3.5% cancelled), Mansfield Woodhouse (17.3 km south, 88.0% on time, 3.2% cancelled) and Mansfield (19.5 km south, 84.4% on time, 3.0% cancelled), which are the stations on its network closest to Worksop.
Within 30 km of here, East Midlands Railway runs best at Gainsborough Lea Road, 24.9 km east (89.4%), and worst at Sheffield, 23.7 km west (57.7%).
The busiest East Midlands Railway station within 30 km of Worksop is Chesterfield, 21.4 km west, with about 97 scheduled stops a day.
Of the 2 operators with enough records at Worksop, East Midlands Railway is the most punctual, at 86.5%.
East Midlands Railway at Worksop has slipped a little, from 88.9% within three minutes in the previous 13 periods to 86.5% in the latest 13, a fall of 2.4 percentage points. Cancellations rose to 3.6% of scheduled stops from 2.6%, which is 1.0 percentage points more.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 816 | 86.1% | 2.1% |
| Period 6 of 2026-27 | 815 | 89.9% | 4.0% |
| Period 5 of 2026-27 | 806 | 81.1% | 5.3% |
| Period 4 of 2026-27 | 736 | 87.3% | 4.5% |
| Period 3 of 2026-27 | 762 | 80.4% | 2.9% |
| Period 2 of 2026-27 | 824 | 88.3% | 7.6% |
| Period 1 of 2026-27 | 954 | 87.8% | 2.6% |
| Period 13 of 2025-26 | 884 | 92.4% | 4.9% |
| Period 12 of 2025-26 | 816 | 87.9% | 2.8% |
| Period 11 of 2025-26 | 814 | 86.5% | 2.5% |
| Period 10 of 2025-26 | 746 | 90.9% | 3.9% |
| Period 9 of 2025-26 | 816 | 80.2% | 2.7% |
| Period 8 of 2025-26 | 824 | 85.1% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Worksop
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 14,520 | 81.4% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out