Wool
WOOSouth WestManaged by South Western Railway
How this station is performing
Wool had 16,344 scheduled stops to Period 7 of 2026-27, about 45 a day. 71.1% of recorded arrivals were within three minutes of the timetable and 4.8% of scheduled stops were cancelled.
Wool opened on 1 June 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Wool is the oldest; the next oldest, Moreton (Dorset), dates from 1847.
The nearest stations to Wool are Moreton (Dorset) (6.9 km west), Wareham (Dorset) (7.5 km east), Holton Heath (10.6 km east), Hamworthy (15.0 km east) and Dorchester South (15.6 km west). 2 stations lie within 10 km in all. Of the five, Moreton (Dorset) is the most punctual at 75.2% and Wareham (Dorset) the least at 70.5%, with Wool on 71.1%.
Wool takes its name from a Village called Wool, home to about 5,374 people, and the station stands 0.2 km from its centre.
Wool has slipped a little, from 75.8% within three minutes in the previous 13 periods to 71.1% in the latest 13, a fall of 4.7 percentage points. Cancellations rose to 4.8% of scheduled stops from 4.2%, which is 0.6 percentage points more.
1 of 3 stations of a similar size in South West are more punctual than Wool on 71.1%. The comparison group includes Lostwithiel (69.1%), Bridgwater (72.2%) and Castle Cary (57.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 16,344 | 71.1% | 4.8% |
Operators with their own page for this station are linked to it.
Late train at Wool? Delay Repay
These operators call at Wool and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,277 | 64.6% | 4.3% |
| Period 6 of 2026-27 | 1,275 | 77.3% | 1.6% |
| Period 5 of 2026-27 | 1,295 | 66.7% | 4.5% |
| Period 4 of 2026-27 | 1,267 | 60.7% | 5.1% |
| Period 3 of 2026-27 | 1,237 | 71.2% | 6.1% |
| Period 2 of 2026-27 | 1,262 | 66.2% | 7.2% |
| Period 1 of 2026-27 | 1,445 | 82.7% | 2.8% |
| Period 13 of 2025-26 | 1,399 | 77.1% | 4.0% |
| Period 12 of 2025-26 | 1,274 | 76.9% | 7.0% |
| Period 11 of 2025-26 | 1,269 | 79.2% | 7.3% |
| Period 10 of 2025-26 | 1,116 | 73.1% | 3.7% |
| Period 9 of 2025-26 | 957 | 60.9% | 3.9% |
| Period 8 of 2025-26 | 1,271 | 63.3% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lostwithiel | 16,403 | 69.1% | 6.5% |
| Bridgwater | 16,539 | 72.2% | 3.0% |
| Castle Cary | 15,993 | 57.2% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out