Bridgwater
BWTSouth WestManaged by Great Western Railway
How this station is performing
Bridgwater had 16,539 scheduled stops to Period 7 of 2026-27, about 45 a day. 72.2% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Bridgwater opened on 14 June 1841, 185 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bridgwater is the oldest; the next oldest, Highbridge and Burnham, dates from 1841.
Bridgwater is remote: its nearest neighbours are Highbridge and Burnham (10.1 km north), Taunton (14.0 km south-west), Weston-Super-Mare (24.1 km north), Weston Milton (24.8 km north) and Worle (26.2 km north). Of the five, Highbridge and Burnham is the most punctual at 72.8% and Taunton the least at 59.2%, with Bridgwater on 72.2%.
Bridgwater takes its name from a market town called Bridgwater, home to about 38,310 people, and the station stands 0.2 km from its centre.
For Bridgwater, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 58.1% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2025-26, at 83.4%, which is 25.3 percentage points higher. Cancellations peaked at 10.6% of scheduled stops in Period 9 of 2023-24, against 3.0% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Bridgwater is the most punctual, at 72.2%. The comparison group includes Lostwithiel (69.1%), Wool (71.1%) and Hayle (67.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 16,539 | 72.2% | 3.0% |
Operators with their own page for this station are linked to it.
Late train at Bridgwater? Delay Repay
These operators call at Bridgwater and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,276 | 77.7% | 3.8% |
| Period 6 of 2026-27 | 1,260 | 70.7% | 1.8% |
| Period 5 of 2026-27 | 1,283 | 64.9% | 5.6% |
| Period 4 of 2026-27 | 1,284 | 71.1% | 2.8% |
| Period 3 of 2026-27 | 1,263 | 70.3% | 3.9% |
| Period 2 of 2026-27 | 1,264 | 73.5% | 1.9% |
| Period 1 of 2026-27 | 1,414 | 76.9% | 1.0% |
| Period 13 of 2025-26 | 1,371 | 79.5% | 1.1% |
| Period 12 of 2025-26 | 1,261 | 83.4% | 0.7% |
| Period 11 of 2025-26 | 1,214 | 80.4% | 2.7% |
| Period 10 of 2025-26 | 1,125 | 66.3% | 4.2% |
| Period 9 of 2025-26 | 1,283 | 58.1% | 5.1% |
| Period 8 of 2025-26 | 1,241 | 63.3% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lostwithiel | 16,403 | 69.1% | 6.5% |
| Wool | 16,344 | 71.1% | 4.8% |
| Hayle | 16,910 | 67.9% | 7.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out