South Western Railway at Winchester
All trains at WinchesterSouth Western Railway across BritainSouth East
How this operator is doing here
South Western Railway had 45,826 scheduled stops at Winchester in the 13 periods to Period 7 of 2026-27, 81% of the station's total. 67.8% of recorded arrivals came within three minutes and 3.7% of stops were cancelled.
South Western Railway trains at Winchester also serve Shawford (5.0 km south, 78.9% on time, 4.3% cancelled), Chandlers Ford (10.4 km south-west, 76.2% on time, 3.3% cancelled), Eastleigh (11.2 km south, 71.6% on time, 2.9% cancelled), Southampton Airport Parkway (13.3 km south, 68.4% on time, 3.2% cancelled), Micheldever (13.5 km north, 65.6% on time, 2.5% cancelled) and Swaythling (14.6 km south, 75.4% on time, 2.5% cancelled), which are the stations on its network closest to Winchester.
Within 30 km of here, South Western Railway runs best at Alton, 26.4 km east (85.0%), and worst at Micheldever, 13.5 km north (65.6%).
The busiest South Western Railway station within 30 km of Winchester is Basingstoke, 27.6 km north-east, with about 208 scheduled stops a day.
South Western Railway at Winchester has slipped a little, from 72.3% within three minutes in the previous 13 periods to 67.8% in the latest 13, a fall of 4.5 percentage points. Cancellations rose to 3.7% of scheduled stops from 2.8%, which is 0.9 percentage points more.
Period by period
See how South Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,551 | 60.7% | 3.3% |
| Period 6 of 2026-27 | 3,583 | 65.7% | 1.5% |
| Period 5 of 2026-27 | 3,607 | 56.0% | 4.1% |
| Period 4 of 2026-27 | 3,551 | 55.4% | 4.3% |
| Period 3 of 2026-27 | 3,435 | 70.5% | 5.4% |
| Period 2 of 2026-27 | 3,503 | 60.4% | 5.0% |
| Period 1 of 2026-27 | 3,876 | 79.7% | 2.3% |
| Period 13 of 2025-26 | 3,552 | 83.0% | 3.2% |
| Period 12 of 2025-26 | 3,313 | 76.9% | 5.2% |
| Period 11 of 2025-26 | 3,568 | 75.8% | 4.2% |
| Period 10 of 2025-26 | 3,141 | 73.2% | 3.5% |
| Period 9 of 2025-26 | 3,539 | 59.8% | 2.9% |
| Period 8 of 2025-26 | 3,607 | 65.0% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Winchester
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 11,064 | 58.6% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out