Winchester had 56,890 scheduled stops to Period 7 of 2026-27, about 156 a day. 66.0% of recorded arrivals were within three minutes of the timetable and 3.8% of scheduled stops were cancelled.
Winchester opened on 10 June 1839, 187 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Winchester is the oldest; the next oldest, Eastleigh, dates from 1839.
The nearest stations to Winchester are Shawford (5.0 km south), Chandlers Ford (10.4 km south-west), Eastleigh (11.2 km south), Southampton Airport Parkway (13.3 km south) and Micheldever (13.5 km north). 1 stations lie within 10 km in all. Of the five, Shawford is the most punctual at 78.9% and Micheldever the least at 65.6%, with Winchester on 66.0%.
Winchester takes its name from a city called Winchester, home to about 35,200 people, and the station stands 0.9 km from its centre.
2 operators call at Winchester: South Western Railway (67.8%, 81% of stops) and CrossCountry (58.6%, 19% of stops). The operator you travel with matters: South Western Railway reaches 67.8% within three minutes while CrossCountry manages 58.6%, a gap of 9.2 percentage points.
Compared with 3 stations of a similar size in South East, Winchester is the least punctual, at 66.0%. All of them are ahead, including Faversham (70.7%), Preston Park (76.3%) and Horley (76.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 45,826 | 67.8% | 3.7% |
| CrossCountry | 11,064 | 58.6% | 4.1% |
Operators with their own page for this station are linked to it.
Late train at Winchester? Delay Repay
These operators call at Winchester and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,404 | 57.9% | 3.8% |
| Period 6 of 2026-27 | 4,468 | 61.7% | 2.3% |
| Period 5 of 2026-27 | 4,466 | 54.0% | 4.3% |
| Period 4 of 2026-27 | 4,413 | 53.3% | 4.7% |
| Period 3 of 2026-27 | 4,316 | 66.9% | 5.0% |
| Period 2 of 2026-27 | 4,341 | 59.0% | 5.2% |
| Period 1 of 2026-27 | 4,747 | 78.6% | 2.0% |
| Period 13 of 2025-26 | 4,421 | 81.9% | 3.0% |
| Period 12 of 2025-26 | 4,136 | 77.0% | 5.3% |
| Period 11 of 2025-26 | 4,427 | 75.0% | 3.9% |
| Period 10 of 2025-26 | 3,918 | 72.0% | 4.0% |
| Period 9 of 2025-26 | 4,391 | 57.8% | 2.9% |
| Period 8 of 2025-26 | 4,442 | 63.5% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Faversham | 56,896 | 70.7% | 1.2% |
| Preston Park | 56,737 | 76.3% | 5.4% |
| Horley | 57,380 | 76.4% | 7.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out