CrossCountry at Winchester
All trains at WinchesterCrossCountry across BritainSouth East
How this operator is doing here
CrossCountry had 11,064 scheduled stops at Winchester in the 13 periods to Period 7 of 2026-27, 19% of the station's total. 58.6% of recorded arrivals came within three minutes and 4.1% of stops were cancelled.
CrossCountry trains at Winchester also serve Eastleigh (11.2 km south, 77.6% on time, 9.7% cancelled), Southampton Airport Parkway (13.3 km south, 60.9% on time, 4.2% cancelled), Southampton Central (18.9 km south, 60.2% on time, 5.8% cancelled), Totton (20.2 km south-west, – on time, – cancelled), Overton (21.2 km north, – on time, – cancelled) and Basingstoke (27.6 km north-east, 57.8% on time, 3.8% cancelled), which are the stations on its network closest to Winchester.
Within 30 km of here, CrossCountry runs best at Southampton Airport Parkway, 13.3 km south (60.9%), and worst at Basingstoke, 27.6 km north-east (57.8%).
The busiest CrossCountry station within 30 km of Winchester is Southampton Central, 18.9 km south, with about 32 scheduled stops a day.
CrossCountry at Winchester has slipped sharply. 58.6% of stops came within three minutes of the timetable in the latest 13 periods, 6.3 percentage points worse than the 64.9% recorded in the 13 before. Cancellations fell to 4.1% of scheduled stops from 4.9%, which is 0.8 percentage points fewer.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 853 | 46.2% | 6.1% |
| Period 6 of 2026-27 | 885 | 44.6% | 5.5% |
| Period 5 of 2026-27 | 859 | 45.6% | 5.0% |
| Period 4 of 2026-27 | 862 | 44.5% | 6.1% |
| Period 3 of 2026-27 | 881 | 52.9% | 3.5% |
| Period 2 of 2026-27 | 838 | 53.2% | 5.7% |
| Period 1 of 2026-27 | 871 | 74.0% | 0.7% |
| Period 13 of 2025-26 | 869 | 77.8% | 2.1% |
| Period 12 of 2025-26 | 823 | 77.2% | 5.8% |
| Period 11 of 2025-26 | 859 | 71.6% | 2.7% |
| Period 10 of 2025-26 | 777 | 67.1% | 6.0% |
| Period 9 of 2025-26 | 852 | 49.9% | 2.8% |
| Period 8 of 2025-26 | 835 | 57.3% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Winchester
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 45,826 | 67.8% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out