Horley
HORSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Horley had 57,380 scheduled stops to Period 7 of 2026-27, about 158 a day. 76.4% of recorded arrivals were within three minutes of the timetable and 7.1% of scheduled stops were cancelled.
Horley opened on 12 July 1841, 185 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Horley is the oldest; the next oldest, Three Bridges, dates from 1841.
The nearest stations to Horley are Gatwick Airport (1.4 km south), Salfords (Surrey) (3.6 km north), Three Bridges (5.7 km south), Earlswood (Surrey) (6.6 km north) and Crawley (6.6 km south). 10 stations lie within 10 km in all. Of the five, Salfords (Surrey) is the most punctual at 77.4% and Gatwick Airport the least at 71.6%, with Horley on 76.4%.
Horley is one of 2 stations named after a town called Horley, home to about 27,426 people; this one stands 0.9 km from its centre.
Cancellations are a particular problem at Horley. 7.1% of scheduled stops did not happen, 2.6 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2320th of 2,374.
1 of 3 stations of a similar size in South East are more punctual than Horley on 76.4%. The comparison group includes Otford (85.2%), Southampton Airport Parkway (67.0%) and Faversham (70.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 57,380 | 76.4% | 7.1% |
Operators with their own page for this station are linked to it.
Late train at Horley? Delay Repay
These operators call at Horley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,503 | 76.0% | 5.1% |
| Period 6 of 2026-27 | 4,485 | 67.3% | 8.7% |
| Period 5 of 2026-27 | 4,301 | 67.1% | 9.6% |
| Period 4 of 2026-27 | 4,455 | 72.8% | 10.4% |
| Period 3 of 2026-27 | 4,080 | 73.7% | 7.1% |
| Period 2 of 2026-27 | 4,256 | 83.2% | 5.7% |
| Period 1 of 2026-27 | 5,083 | 84.0% | 4.9% |
| Period 13 of 2025-26 | 5,021 | 83.9% | 3.1% |
| Period 12 of 2025-26 | 4,508 | 77.4% | 7.5% |
| Period 11 of 2025-26 | 3,803 | 75.5% | 6.2% |
| Period 10 of 2025-26 | 3,887 | 79.4% | 7.6% |
| Period 9 of 2025-26 | 4,488 | 71.0% | 11.7% |
| Period 8 of 2025-26 | 4,510 | 77.9% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Otford | 57,851 | 85.2% | 2.1% |
| Southampton Airport Parkway | 57,864 | 67.0% | 3.5% |
| Faversham | 56,896 | 70.7% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out