Whyteleafe South
WHSSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Whyteleafe South had 25,902 scheduled stops to Period 7 of 2026-27, about 71 a day. 82.8% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Whyteleafe South opened on 5 August 1856, 170 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Whyteleafe South is the oldest; the next oldest, Caterham, dates from 1856.
The nearest stations to Whyteleafe South are Upper Warlingham (0.6 km north), Whyteleafe (0.8 km north), Caterham (2.4 km south), Woldingham (2.4 km south-east) and Kenley (2.9 km north-west). 33 stations lie within 10 km in all. Of the five, Caterham is the most punctual at 85.9% and Kenley the least at 66.9%, with Whyteleafe South on 82.8%.
Whyteleafe South is named after Whyteleafe, a Village, home to about 4,622 people, but the station stands 0.7 km from its centre.
For Whyteleafe South, the weakest four-week period in the data is a recent one: Period 12 of 2025-26, when only 71.7% of stops arrived within three minutes of the timetable. The strongest was Period 5 of 2023-24, at 90.9%, which is 19.2 percentage points higher.
Compared with 3 stations of a similar size in South East, Whyteleafe South is the least punctual, at 82.8%. All of them are ahead, including Caterham (85.9%), Seaford (Sussex) (87.6%) and Upper Warlingham (84.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 25,902 | 82.8% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Whyteleafe South? Delay Repay
These operators call at Whyteleafe South and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,942 | 88.6% | 1.6% |
| Period 6 of 2026-27 | 1,995 | 86.8% | 1.7% |
| Period 5 of 2026-27 | 2,016 | 89.1% | 1.5% |
| Period 4 of 2026-27 | 1,943 | 89.0% | 2.0% |
| Period 3 of 2026-27 | 1,927 | 88.8% | 1.1% |
| Period 2 of 2026-27 | 2,021 | 86.6% | 2.3% |
| Period 1 of 2026-27 | 2,303 | 84.7% | 1.3% |
| Period 13 of 2025-26 | 2,208 | 83.2% | 0.7% |
| Period 12 of 2025-26 | 1,951 | 71.7% | 1.9% |
| Period 11 of 2025-26 | 1,806 | 74.2% | 1.7% |
| Period 10 of 2025-26 | 1,761 | 78.0% | 2.4% |
| Period 9 of 2025-26 | 2,008 | 76.0% | 2.4% |
| Period 8 of 2025-26 | 2,021 | 78.1% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caterham | 25,902 | 85.9% | 1.5% |
| Seaford (Sussex) | 25,902 | 87.6% | 1.6% |
| Upper Warlingham | 25,875 | 84.2% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out