Upper Warlingham
UWLSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Upper Warlingham had 25,875 scheduled stops to Period 7 of 2026-27, about 71 a day. 84.2% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Upper Warlingham opened on 10 March 1884, 142 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Whyteleafe South is the oldest (1856) and Whyteleafe the newest (1900), with Upper Warlingham in between.
The nearest stations to Upper Warlingham are Whyteleafe (0.3 km north-west), Whyteleafe South (0.6 km south), Kenley (2.4 km north-west), Woldingham (2.8 km south-east) and Caterham (2.9 km south). 36 stations lie within 10 km in all. Of the five, Caterham is the most punctual at 85.9% and Kenley the least at 66.9%, with Upper Warlingham on 84.2%.
For Upper Warlingham, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 72.6% of stops arrived within three minutes of the timetable. The strongest was Period 5 of 2023-24, at 94.3%, which is 21.7 percentage points higher.
Compared with 3 stations of a similar size in South East, Upper Warlingham is the least punctual, at 84.2%. All of them are ahead, including Woldingham (85.6%), Caterham (85.9%) and Seaford (Sussex) (87.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 25,875 | 84.2% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Upper Warlingham? Delay Repay
These operators call at Upper Warlingham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,034 | 72.6% | 3.3% |
| Period 6 of 2026-27 | 2,041 | 80.9% | 1.8% |
| Period 5 of 2026-27 | 2,050 | 79.4% | 3.9% |
| Period 4 of 2026-27 | 2,052 | 86.2% | 1.5% |
| Period 3 of 2026-27 | 2,010 | 80.7% | 2.0% |
| Period 2 of 2026-27 | 1,814 | 90.0% | 1.3% |
| Period 1 of 2026-27 | 2,320 | 90.6% | 0.7% |
| Period 13 of 2025-26 | 2,175 | 89.7% | 2.3% |
| Period 12 of 2025-26 | 2,020 | 85.6% | 1.8% |
| Period 11 of 2025-26 | 1,795 | 83.8% | 2.9% |
| Period 10 of 2025-26 | 1,760 | 85.0% | 2.8% |
| Period 9 of 2025-26 | 1,868 | 82.6% | 2.8% |
| Period 8 of 2025-26 | 1,936 | 86.2% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Woldingham | 25,875 | 85.6% | 2.3% |
| Caterham | 25,902 | 85.9% | 1.5% |
| Seaford (Sussex) | 25,902 | 87.6% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out