Seaford (Sussex)
SEFSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Seaford (Sussex) had 25,902 scheduled stops to Period 7 of 2026-27, about 71 a day. 87.6% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Seaford (Sussex) opened on 1 June 1864, 162 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Berwick (Sussex) is the oldest (1846) and Bishopstone (Sussex) the newest (1938), with Seaford (Sussex) in between.
The nearest stations to Seaford (Sussex) are Bishopstone (Sussex) (1.5 km north-west), Newhaven Harbour (3.7 km north-west), Newhaven Town (4.0 km north-west), Southease (8.1 km north-west) and Berwick (Sussex) (8.8 km north-east). 6 stations lie within 10 km in all. Of the five, Bishopstone (Sussex) is the most punctual at 87.8% and Southease the least at 84.5%, with Seaford (Sussex) on 87.6%.
Seaford (Sussex) is named after Seaford, a town, home to about 26,955 people, but the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Seaford (Sussex) was Period 5 of 2025-26, at 83.4%, some time before the latest year. The strongest was Period 6 of 2023-24, at 94.5%, and the two are 11.1 percentage points apart.
Compared with 3 stations of a similar size in South East, Seaford (Sussex) is the most punctual, at 87.6%. The comparison group includes Caterham (85.9%), Whyteleafe South (82.8%) and Upper Warlingham (84.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 25,902 | 87.6% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Seaford (Sussex)? Delay Repay
These operators call at Seaford (Sussex) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,917 | 86.1% | 1.4% |
| Period 6 of 2026-27 | 1,988 | 86.1% | 1.0% |
| Period 5 of 2026-27 | 1,968 | 87.3% | 1.3% |
| Period 4 of 2026-27 | 1,968 | 87.0% | 2.0% |
| Period 3 of 2026-27 | 1,988 | 88.8% | 2.6% |
| Period 2 of 2026-27 | 1,986 | 89.5% | 4.0% |
| Period 1 of 2026-27 | 2,273 | 87.5% | 2.1% |
| Period 13 of 2025-26 | 2,135 | 93.5% | 0.7% |
| Period 12 of 2025-26 | 1,979 | 87.0% | 0.6% |
| Period 11 of 2025-26 | 1,976 | 87.6% | 1.1% |
| Period 10 of 2025-26 | 1,771 | 87.8% | 0.8% |
| Period 9 of 2025-26 | 1,979 | 85.4% | 1.1% |
| Period 8 of 2025-26 | 1,974 | 85.3% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caterham | 25,902 | 85.9% | 1.5% |
| Whyteleafe South | 25,902 | 82.8% | 1.7% |
| Upper Warlingham | 25,875 | 84.2% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out