Westenhanger
WHASouth EastManaged by Southeastern
How this station is performing
Westenhanger had 15,758 scheduled stops to Period 7 of 2026-27, about 43 a day. 82.9% of recorded arrivals were within three minutes of the timetable and 1.0% of scheduled stops were cancelled.
Westenhanger opened on 7 February 1844, 182 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Ashford International is the oldest (1842) and Sandling the newest (1888), with Westenhanger in between.
The nearest stations to Westenhanger are Sandling (2.0 km east), Folkestone West (8.2 km east), Folkestone Central (9.2 km east), Ashford International (12.6 km north-west) and Wye (12.6 km north-west). 3 stations lie within 10 km in all. At 82.9%, Westenhanger is more punctual than every one of them; the best of the five, Sandling, manages 82.6%.
Westenhanger takes its name from a Village called Westenhanger, and the station stands 0.4 km from its centre.
For Westenhanger, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 72.1% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2026-27, at 90.4%, which is 18.3 percentage points higher. Cancellations peaked at 5.0% of scheduled stops in Period 12 of 2023-24, against 1.0% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Westenhanger on 82.9%. The comparison group includes Sandling (82.6%), Edenbridge (Kent) (91.1%) and Godstone (86.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 15,758 | 82.9% | 1.0% |
Operators with their own page for this station are linked to it.
Late train at Westenhanger? Delay Repay
These operators call at Westenhanger and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,182 | 72.1% | 0.8% |
| Period 6 of 2026-27 | 1,210 | 75.4% | 0.9% |
| Period 5 of 2026-27 | 1,218 | 84.1% | 1.0% |
| Period 4 of 2026-27 | 1,182 | 87.7% | 1.7% |
| Period 3 of 2026-27 | 1,221 | 79.7% | 1.1% |
| Period 2 of 2026-27 | 1,203 | 83.9% | 1.1% |
| Period 1 of 2026-27 | 1,348 | 90.4% | 0.5% |
| Period 13 of 2025-26 | 1,343 | 87.6% | 1.4% |
| Period 12 of 2025-26 | 1,223 | 87.8% | 0.4% |
| Period 11 of 2025-26 | 1,182 | 86.7% | 1.4% |
| Period 10 of 2025-26 | 1,044 | 83.4% | 1.2% |
| Period 9 of 2025-26 | 1,222 | 78.6% | 1.1% |
| Period 8 of 2025-26 | 1,180 | 78.3% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Sandling | 15,759 | 82.6% | 1.0% |
| Edenbridge (Kent) | 15,763 | 91.1% | 1.4% |
| Godstone | 15,763 | 86.2% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out