Sandling
SDGSouth EastManaged by Southeastern
How this station is performing
Sandling had 15,759 scheduled stops to Period 7 of 2026-27, about 43 a day. 82.6% of recorded arrivals were within three minutes of the timetable and 1.0% of scheduled stops were cancelled.
Sandling opened on 1 January 1888, 138 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Sandling is the newest; the oldest, Ashford International, opened in 1842.
The nearest stations to Sandling are Westenhanger (2.0 km west), Folkestone West (6.2 km east), Folkestone Central (7.2 km east), Wye (14.3 km north-west) and Ashford International (14.6 km north-west). 3 stations lie within 10 km in all. Of the five, Westenhanger is the most punctual at 82.9% and Wye the least at 77.6%, with Sandling on 82.6%.
Sandling is one of 2 stations named after a Village called Sandling; this one stands 0.2 km from its centre.
For Sandling, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 71.9% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2023-24, at 90.4%, which is 18.5 percentage points higher. Cancellations peaked at 5.0% of scheduled stops in Period 12 of 2023-24, against 1.0% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Sandling is the least punctual, at 82.6%. All of them are ahead, including Westenhanger (82.9%), Edenbridge (Kent) (91.1%) and Godstone (86.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 15,759 | 82.6% | 1.0% |
Operators with their own page for this station are linked to it.
Late train at Sandling? Delay Repay
These operators call at Sandling and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,182 | 71.9% | 0.8% |
| Period 6 of 2026-27 | 1,210 | 75.5% | 0.9% |
| Period 5 of 2026-27 | 1,218 | 84.0% | 1.0% |
| Period 4 of 2026-27 | 1,182 | 87.3% | 1.7% |
| Period 3 of 2026-27 | 1,222 | 79.5% | 1.0% |
| Period 2 of 2026-27 | 1,203 | 83.9% | 1.1% |
| Period 1 of 2026-27 | 1,348 | 90.2% | 0.5% |
| Period 13 of 2025-26 | 1,343 | 87.1% | 1.4% |
| Period 12 of 2025-26 | 1,223 | 87.1% | 0.3% |
| Period 11 of 2025-26 | 1,182 | 86.5% | 1.4% |
| Period 10 of 2025-26 | 1,044 | 82.9% | 1.2% |
| Period 9 of 2025-26 | 1,222 | 78.5% | 1.1% |
| Period 8 of 2025-26 | 1,180 | 77.7% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Westenhanger | 15,758 | 82.9% | 1.0% |
| Edenbridge (Kent) | 15,763 | 91.1% | 1.4% |
| Godstone | 15,763 | 86.2% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out