Edenbridge (Kent)
EBRSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Edenbridge (Kent) had 15,763 scheduled stops to Period 7 of 2026-27, about 43 a day. 91.1% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Edenbridge (Kent) opened on 26 May 1842, 184 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Edenbridge (Kent) is the oldest; the next oldest, Lingfield, dates from 1884.
The nearest stations to Edenbridge (Kent) are Edenbridge Town (1.0 km south-east), Hever (3.9 km south-east), Hurst Green (5.6 km north-west), Lingfield (5.9 km south-west) and Cowden (Kent) (6.8 km south-east). 9 stations lie within 10 km in all. Of the five, Lingfield is the most punctual at 91.5% and Cowden (Kent) the least at 68.4%, with Edenbridge (Kent) on 91.1%.
Edenbridge (Kent) is named after Edenbridge, a town, home to about 9,881 people, but the station stands 1.2 km from its centre.
For Edenbridge (Kent), the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 69.8% of stops arrived within three minutes of the timetable. The strongest was Period 5 of 2025-26, at 97.2%, which is 27.4 percentage points higher. Cancellations peaked at 5.3% of scheduled stops in Period 9 of 2024-25, against 1.4% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Edenbridge (Kent) is the most punctual, at 91.1%. The comparison group includes Godstone (86.2%), Nutfield (82.5%) and Sandling (82.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 15,763 | 91.1% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Edenbridge (Kent)? Delay Repay
These operators call at Edenbridge (Kent) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,232 | 69.8% | 1.7% |
| Period 6 of 2026-27 | 1,188 | 74.6% | 1.7% |
| Period 5 of 2026-27 | 1,233 | 93.3% | 3.5% |
| Period 4 of 2026-27 | 1,240 | 96.4% | 2.2% |
| Period 3 of 2026-27 | 1,199 | 95.5% | 1.3% |
| Period 2 of 2026-27 | 1,213 | 96.1% | 0.7% |
| Period 1 of 2026-27 | 1,399 | 95.7% | 0.7% |
| Period 13 of 2025-26 | 1,330 | 96.0% | 0.5% |
| Period 12 of 2025-26 | 1,232 | 96.7% | 0.1% |
| Period 11 of 2025-26 | 1,029 | 94.6% | 1.2% |
| Period 10 of 2025-26 | 1,012 | 89.8% | 2.4% |
| Period 9 of 2025-26 | 1,220 | 91.7% | 2.1% |
| Period 8 of 2025-26 | 1,236 | 92.1% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out