Southeastern had 34,478 scheduled stops at Westcombe Park in the 13 periods to Period 7 of 2026-27, 61% of the station's total. 91.6% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
Southeastern trains at Westcombe Park also serve Charlton (0.9 km east, 88.3% on time, 1.6% cancelled), Maze Hill (1.1 km west, 90.8% on time, 1.8% cancelled), Blackheath (2.2 km south, 87.6% on time, 1.8% cancelled), Greenwich (2.5 km west, 89.5% on time, 1.8% cancelled), Kidbrooke (2.6 km south, 85.1% on time, 2.1% cancelled) and Woolwich Dockyard (2.6 km east, 91.0% on time, 1.6% cancelled), which are the stations on its network closest to Westcombe Park.
Within 30 km of here, Southeastern runs best at Sundridge Park, 7.8 km south (99.4%), and worst at Sevenoaks, 25.7 km south-east (72.3%).
The busiest Southeastern station within 30 km of Westcombe Park is London Bridge, 7.5 km west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Westcombe Park, Southeastern is the most punctual, at 91.6%.
Southeastern at Westcombe Park has not moved in one direction over three full railway years: 86.5% within three minutes in 2023-24, 92.6% in 2024-25 and 92.4% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,740 | 92.4% | 1.1% |
| Period 6 of 2026-27 | 2,645 | 92.3% | 0.8% |
| Period 5 of 2026-27 | 2,608 | 92.5% | 2.4% |
| Period 4 of 2026-27 | 2,608 | 91.7% | 2.1% |
| Period 3 of 2026-27 | 2,374 | 89.0% | 4.5% |
| Period 2 of 2026-27 | 2,536 | 91.4% | 2.4% |
| Period 1 of 2026-27 | 3,073 | 91.6% | 1.5% |
| Period 13 of 2025-26 | 3,010 | 90.4% | 1.4% |
| Period 12 of 2025-26 | 2,665 | 91.8% | 1.5% |
| Period 11 of 2025-26 | 2,663 | 93.7% | 1.5% |
| Period 10 of 2025-26 | 2,306 | 92.7% | 0.8% |
| Period 9 of 2025-26 | 2,589 | 90.1% | 1.3% |
| Period 8 of 2025-26 | 2,661 | 90.6% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Westcombe Park
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 21,759 | 82.7% | 6.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out