GTR at Westcombe Park
How this operator is doing here
GTR had 21,759 scheduled stops at Westcombe Park in the 13 periods to Period 7 of 2026-27, 39% of the station's total. 82.7% of recorded arrivals came within three minutes and 6.7% of stops were cancelled.
GTR trains at Westcombe Park also serve Charlton (0.9 km east, 84.1% on time, 6.5% cancelled), Maze Hill (1.1 km west, 82.5% on time, 6.7% cancelled), Blackheath (2.2 km south, 91.6% on time, 1.3% cancelled), Greenwich (2.5 km west, 81.9% on time, 6.7% cancelled), Lewisham (3.1 km south-west, 90.9% on time, 1.0% cancelled) and Deptford (3.2 km west, 84.1% on time, 6.8% cancelled), which are the stations on its network closest to Westcombe Park.
Within 30 km of here, GTR runs best at Beckenham Junction, 8.7 km south (98.1%), and worst at Kenley, 19.6 km south-west (66.9%).
The busiest GTR station within 30 km of Westcombe Park is East Croydon, 14.4 km south-west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Westcombe Park, GTR is the least punctual, at 82.7%.
For GTR, Westcombe Park ranks 174th of 307 stations and is typical: 82.7% here against 82.9% across the network, a difference of 0.2 percentage points.
GTR at Westcombe Park has not moved in one direction over three full railway years: 87.1% within three minutes in 2023-24, 83.8% in 2024-25 and 84.6% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,865 | 82.5% | 6.0% |
| Period 6 of 2026-27 | 1,655 | 79.8% | 5.0% |
| Period 5 of 2026-27 | 1,232 | 81.5% | 7.6% |
| Period 4 of 2026-27 | 1,616 | 80.5% | 5.0% |
| Period 3 of 2026-27 | 1,119 | 80.5% | 6.7% |
| Period 2 of 2026-27 | 1,594 | 82.5% | 4.4% |
| Period 1 of 2026-27 | 1,944 | 86.7% | 5.0% |
| Period 13 of 2025-26 | 1,998 | 85.2% | 2.8% |
| Period 12 of 2025-26 | 1,737 | 82.4% | 8.2% |
| Period 11 of 2025-26 | 1,797 | 83.9% | 8.7% |
| Period 10 of 2025-26 | 1,599 | 86.2% | 9.8% |
| Period 9 of 2025-26 | 1,837 | 81.2% | 10.6% |
| Period 8 of 2025-26 | 1,766 | 79.8% | 7.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Westcombe Park
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 34,478 | 91.6% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out