Westcombe Park
WCBLondonManaged by Southeastern
How this station is performing
Westcombe Park had 56,237 scheduled stops to Period 7 of 2026-27, about 154 a day. 88.2% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
Westcombe Park opened on 1 May 1879, 147 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Greenwich is the oldest (1838) and Kidbrooke the newest (1895), with Westcombe Park in between.
The nearest stations to Westcombe Park are Charlton (0.9 km east), Maze Hill (1.1 km west), Blackheath (2.2 km south), Greenwich (2.5 km west) and Kidbrooke (2.6 km south). 118 stations lie within 10 km in all. At 88.2%, Westcombe Park is more punctual than every one of them; the best of the five, Maze Hill, manages 87.7%.
Westcombe Park takes its name from an area of London called Westcombe Park, and the station stands 0.0 km from its centre.
2 operators call at Westcombe Park: Southeastern (91.6%, 61% of stops) and GTR (82.7%, 39% of stops). The operator you travel with matters: Southeastern reaches 91.6% within three minutes while GTR manages 82.7%, a gap of 8.9 percentage points.
2 of 3 stations of a similar size in London are more punctual than Westcombe Park on 88.2%. The comparison group includes Erith (92.2%), Belvedere (92.6%) and Deptford (86.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 34,478 | 91.6% | 1.8% |
| GTR | 21,759 | 82.7% | 6.7% |
Operators with their own page for this station are linked to it.
Late train at Westcombe Park? Delay Repay
These operators call at Westcombe Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,605 | 88.5% | 3.0% |
| Period 6 of 2026-27 | 4,300 | 87.6% | 2.4% |
| Period 5 of 2026-27 | 3,840 | 89.1% | 4.1% |
| Period 4 of 2026-27 | 4,224 | 87.5% | 3.2% |
| Period 3 of 2026-27 | 3,493 | 86.3% | 5.2% |
| Period 2 of 2026-27 | 4,130 | 88.0% | 3.2% |
| Period 1 of 2026-27 | 5,017 | 89.7% | 2.9% |
| Period 13 of 2025-26 | 5,008 | 88.3% | 2.0% |
| Period 12 of 2025-26 | 4,402 | 88.3% | 4.2% |
| Period 11 of 2025-26 | 4,460 | 89.9% | 4.4% |
| Period 10 of 2025-26 | 3,905 | 90.2% | 4.5% |
| Period 9 of 2025-26 | 4,426 | 86.6% | 5.2% |
| Period 8 of 2025-26 | 4,427 | 86.4% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out