Westbury
WSBSouth WestManaged by Great Western Railway
How this station is performing
Westbury had 50,875 scheduled stops to Period 7 of 2026-27, about 140 a day. 69.7% of recorded arrivals were within three minutes of the timetable and 4.6% of scheduled stops were cancelled.
Westbury opened on 5 September 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Westbury is the oldest; the next oldest, Trowbridge, dates from 1848.
The nearest stations to Westbury are Dilton Marsh (2.0 km south), Trowbridge (6.1 km north), Warminster (6.8 km south), Frome (8.8 km south-west) and Bradford-on-Avon (9.5 km north-west). 6 stations lie within 10 km in all. At 69.7%, Westbury is less punctual than all of them; the best of the five, Trowbridge, manages 74.3%.
Westbury is one of 5 stations named after a town called Westbury, home to about 16,406 people; this one stands 0.9 km from its centre.
2 operators call at Westbury: Great Western Railway (69.5%, 95% of stops) and South Western Railway (72.6%, 5% of stops). They are close together, with South Western Railway leading on 72.6% and Great Western Railway trailing on 69.5%, a gap of 3.1 percentage points.
2 of 3 stations of a similar size in South West are more punctual than Westbury on 69.7%. The comparison group includes Exeter Central (80.8%), Filton Abbey Wood (77.2%) and Bournemouth (69.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 48,346 | 69.5% | 4.5% |
| South Western Railway | 2,529 | 72.6% | 7.0% |
Operators with their own page for this station are linked to it.
Late train at Westbury? Delay Repay
These operators call at Westbury and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,747 | 67.4% | 3.6% |
| Period 6 of 2026-27 | 3,912 | 64.7% | 3.2% |
| Period 5 of 2026-27 | 3,785 | 63.2% | 5.4% |
| Period 4 of 2026-27 | 3,941 | 61.4% | 6.4% |
| Period 3 of 2026-27 | 3,828 | 69.6% | 7.6% |
| Period 2 of 2026-27 | 3,877 | 68.7% | 6.6% |
| Period 1 of 2026-27 | 4,352 | 77.2% | 2.5% |
| Period 13 of 2025-26 | 4,309 | 76.5% | 3.6% |
| Period 12 of 2025-26 | 3,913 | 81.1% | 1.6% |
| Period 11 of 2025-26 | 3,910 | 80.5% | 3.8% |
| Period 10 of 2025-26 | 3,465 | 69.2% | 5.1% |
| Period 9 of 2025-26 | 3,956 | 59.7% | 5.4% |
| Period 8 of 2025-26 | 3,880 | 64.0% | 5.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Exeter Central | 51,660 | 80.8% | 3.1% |
| Filton Abbey Wood | 54,087 | 77.2% | 5.3% |
| Bournemouth | 54,262 | 69.7% | 5.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out