Bournemouth
BMHSouth WestManaged by South Western Railway
How this station is performing
Bournemouth had 54,262 scheduled stops to Period 7 of 2026-27, about 149 a day. 69.7% of recorded arrivals were within three minutes of the timetable and 5.1% of scheduled stops were cancelled.
Bournemouth opened on 14 March 1870. It was moved to the site it uses now on 20 July 1885. Among the 5 stations nearest to it with a known opening date, Christchurch is the oldest (1862) and Branksome the newest (1893), with Bournemouth in between.
The nearest stations to Bournemouth are Pokesdown (2.7 km east), Branksome (3.9 km west), Christchurch (5.7 km east), Parkstone (Dorset) (5.9 km west) and Poole (8.5 km west). 5 stations lie within 10 km in all. At 69.7%, Bournemouth is less punctual than all of them; the best of the five, Branksome, manages 74.5%.
Bournemouth takes its name from a town of the United Kingdom called Bournemouth, home to about 187,503 people, and the station stands 1.4 km from its centre.
2 operators call at Bournemouth: South Western Railway (70.0%, 81% of stops) and CrossCountry (68.1%, 19% of stops). They are close together, with South Western Railway leading on 70.0% and CrossCountry trailing on 68.1%, a gap of 1.9 percentage points.
2 of 3 stations of a similar size in South West are more punctual than Bournemouth on 69.7%. The comparison group includes Filton Abbey Wood (77.2%), Exeter Central (80.8%) and Bath Spa (68.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 44,177 | 70.0% | 4.4% |
| CrossCountry | 10,085 | 68.1% | 8.4% |
Operators with their own page for this station are linked to it.
Late train at Bournemouth? Delay Repay
These operators call at Bournemouth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,978 | 64.9% | 4.8% |
| Period 6 of 2026-27 | 4,228 | 74.6% | 2.7% |
| Period 5 of 2026-27 | 4,220 | 64.6% | 5.4% |
| Period 4 of 2026-27 | 4,191 | 56.6% | 6.7% |
| Period 3 of 2026-27 | 4,124 | 67.2% | 7.2% |
| Period 2 of 2026-27 | 4,210 | 63.6% | 6.7% |
| Period 1 of 2026-27 | 4,709 | 80.8% | 3.0% |
| Period 13 of 2025-26 | 4,590 | 77.8% | 4.6% |
| Period 12 of 2025-26 | 3,996 | 77.3% | 5.9% |
| Period 11 of 2025-26 | 4,216 | 77.0% | 6.8% |
| Period 10 of 2025-26 | 3,714 | 72.8% | 4.2% |
| Period 9 of 2025-26 | 4,209 | 63.5% | 4.5% |
| Period 8 of 2025-26 | 3,877 | 62.0% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Filton Abbey Wood | 54,087 | 77.2% | 5.3% |
| Exeter Central | 51,660 | 80.8% | 3.1% |
| Bath Spa | 57,295 | 68.5% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out