Filton Abbey Wood
FITSouth WestManaged by Great Western Railway
How this station is performing
Filton Abbey Wood had 54,087 scheduled stops to Period 7 of 2026-27, about 149 a day. 77.2% of recorded arrivals were within three minutes of the timetable and 5.3% of scheduled stops were cancelled.
Filton Abbey Wood opened on 8 September 1863. It was moved to the site it uses now on 11 March 1996. Of the 5 stations nearest to it with a known opening date, Filton Abbey Wood is the oldest; the next oldest, Patchway, dates from 1863.
The nearest stations to Filton Abbey Wood are Bristol Parkway (1.9 km north-east), Patchway (2.5 km north), Ashley Down (2.9 km south), Stapleton Road (4.0 km south) and Montpelier (4.3 km south-west). 18 stations lie within 10 km in all. Of the five, Ashley Down is the most punctual at 84.7% and Bristol Parkway the least at 66.2%, with Filton Abbey Wood on 77.2%.
Filton Abbey Wood is named after Filton, a town, home to about 11,295 people, but the station stands 2.9 km from its centre.
1 of 3 stations of a similar size in South West are more punctual than Filton Abbey Wood on 77.2%. The comparison group includes Bournemouth (69.7%), Exeter Central (80.8%) and Bath Spa (68.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 54,087 | 77.2% | 5.3% |
Operators with their own page for this station are linked to it.
Late train at Filton Abbey Wood? Delay Repay
These operators call at Filton Abbey Wood and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,269 | 75.9% | 4.5% |
| Period 6 of 2026-27 | 4,270 | 73.9% | 8.1% |
| Period 5 of 2026-27 | 3,952 | 68.7% | 8.4% |
| Period 4 of 2026-27 | 4,266 | 73.0% | 7.7% |
| Period 3 of 2026-27 | 3,720 | 76.5% | 10.1% |
| Period 2 of 2026-27 | 3,819 | 74.2% | 4.6% |
| Period 1 of 2026-27 | 4,751 | 83.4% | 2.6% |
| Period 13 of 2025-26 | 4,556 | 82.7% | 2.8% |
| Period 12 of 2025-26 | 4,224 | 86.4% | 2.4% |
| Period 11 of 2025-26 | 4,226 | 85.2% | 3.3% |
| Period 10 of 2025-26 | 3,673 | 75.3% | 4.5% |
| Period 9 of 2025-26 | 4,250 | 68.3% | 7.4% |
| Period 8 of 2025-26 | 4,111 | 75.8% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bournemouth | 54,262 | 69.7% | 5.1% |
| Exeter Central | 51,660 | 80.8% | 3.1% |
| Bath Spa | 57,295 | 68.5% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out