Exeter Central
EXCSouth WestManaged by Great Western Railway
How this station is performing
Exeter Central had 51,660 scheduled stops to Period 7 of 2026-27, about 142 a day. 80.8% of recorded arrivals were within three minutes of the timetable and 3.1% of scheduled stops were cancelled.
Exeter Central opened on 19 July 1860, 166 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Exeter St David's is the oldest (1844) and Marsh Barton the newest (2023), with Exeter Central in between.
The nearest stations to Exeter Central are St James Park (Exeter) (0.8 km north-east), Exeter St David's (0.8 km west), Exeter St Thomas (1.2 km south-west), Polsloe Bridge (2.2 km east) and Marsh Barton (2.6 km south). 13 stations lie within 10 km in all. Of the five, St James Park (Exeter) is the most punctual at 82.7% and Exeter St David's the least at 73.6%, with Exeter Central on 80.8%.
Exeter Central is named after Exeter, a big city, home to about 124,180 people, but the station stands 0.4 km from its centre.
2 operators call at Exeter Central: Great Western Railway (83.5%, 79% of stops) and South Western Railway (70.4%, 21% of stops). The operator you travel with matters: Great Western Railway reaches 83.5% within three minutes while South Western Railway manages 70.4%, a gap of 13.1 percentage points.
Compared with 3 stations of a similar size in South West, Exeter Central is the most punctual, at 80.8%. The comparison group includes Westbury (69.7%), Filton Abbey Wood (77.2%) and Bournemouth (69.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 40,937 | 83.5% | 3.1% |
| South Western Railway | 10,723 | 70.4% | 3.3% |
Operators with their own page for this station are linked to it.
Late train at Exeter Central? Delay Repay
These operators call at Exeter Central and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,758 | 84.4% | 2.6% |
| Period 6 of 2026-27 | 3,747 | 79.4% | 2.6% |
| Period 5 of 2026-27 | 3,961 | 72.5% | 4.4% |
| Period 4 of 2026-27 | 4,116 | 73.1% | 4.8% |
| Period 3 of 2026-27 | 4,165 | 78.5% | 3.9% |
| Period 2 of 2026-27 | 4,207 | 75.2% | 4.3% |
| Period 1 of 2026-27 | 4,747 | 83.5% | 1.6% |
| Period 13 of 2025-26 | 4,391 | 86.5% | 1.9% |
| Period 12 of 2025-26 | 3,352 | 88.2% | 1.3% |
| Period 11 of 2025-26 | 3,856 | 84.9% | 3.4% |
| Period 10 of 2025-26 | 3,843 | 82.9% | 3.6% |
| Period 9 of 2025-26 | 3,778 | 79.3% | 3.0% |
| Period 8 of 2025-26 | 3,739 | 82.3% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Westbury | 50,875 | 69.7% | 4.6% |
| Filton Abbey Wood | 54,087 | 77.2% | 5.3% |
| Bournemouth | 54,262 | 69.7% | 5.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out