Wembley Stadium
WCXLondonManaged by Chiltern Railways
How this station is performing
Wembley Stadium had 29,934 scheduled stops to Period 7 of 2026-27, about 82 a day. 88.2% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Wembley Stadium opened on 1 March 1906, 120 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Wembley Central is the oldest (1842) and South Kenton the newest (1933), with Wembley Stadium in between.
The nearest stations to Wembley Stadium are Wembley Central (0.8 km west), Stonebridge Park (1.3 km south-east), North Wembley (1.6 km north-west), Sudbury and Harrow Road (2.2 km west) and South Kenton (2.4 km north-west). 58 stations lie within 10 km in all. Of the five, Stonebridge Park is the most punctual at 91.9% and North Wembley the least at 88.1%, with Wembley Stadium on 88.2%.
Wembley Stadium is named after Wembley, an area of London, home to about 90,045 people, but the station stands 1.4 km from its centre.
1 of 3 stations of a similar size in London are more punctual than Wembley Stadium on 88.2%. The comparison group includes Brimsdown (86.4%), Chelsfield (80.2%) and Meridian Water (96.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 29,934 | 88.2% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Wembley Stadium? Delay Repay
These operators call at Wembley Stadium and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,290 | 81.4% | 1.2% |
| Period 6 of 2026-27 | 2,260 | 81.0% | 1.2% |
| Period 5 of 2026-27 | 2,564 | 84.2% | 1.8% |
| Period 4 of 2026-27 | 2,721 | 85.9% | 1.9% |
| Period 3 of 2026-27 | 2,260 | 87.2% | 2.2% |
| Period 2 of 2026-27 | 2,360 | 88.1% | 1.7% |
| Period 1 of 2026-27 | 2,732 | 92.9% | 1.0% |
| Period 13 of 2025-26 | 2,246 | 92.2% | 2.4% |
| Period 12 of 2025-26 | 2,166 | 93.3% | 0.5% |
| Period 11 of 2025-26 | 1,967 | 90.5% | 1.2% |
| Period 10 of 2025-26 | 1,983 | 91.9% | 0.8% |
| Period 9 of 2025-26 | 2,137 | 88.9% | 5.0% |
| Period 8 of 2025-26 | 2,248 | 90.5% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Brimsdown | 29,950 | 86.4% | 2.6% |
| Chelsfield | 30,636 | 80.2% | 1.4% |
| Meridian Water | 29,069 | 96.5% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out