Chelsfield
CLDLondonManaged by Southeastern
How this station is performing
Chelsfield had 30,636 scheduled stops to Period 7 of 2026-27, about 84 a day. 80.2% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Chelsfield opened on 2 March 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, St Mary Cray is the oldest (1860) and Petts Wood the newest (1928), with Chelsfield in between.
The nearest stations to Chelsfield are Knockholt (2.0 km south-east), Orpington (2.3 km north-west), St Mary Cray (4.2 km north), Petts Wood (4.3 km north-west) and Swanley (5.7 km north-east). 23 stations lie within 10 km in all. At 80.2%, Chelsfield is less punctual than all of them; the best of the five, St Mary Cray, manages 85.7%.
Chelsfield takes its name from a Village called Chelsfield, home to about 14,507 people, and the station stands 1.4 km from its centre.
Across the whole run of data, the weakest four-week period for Chelsfield was Period 9 of 2024-25, at 61.7%, some time before the latest year. The strongest was Period 4 of 2023-24, at 91.9%, and the two are 30.2 percentage points apart.
Compared with 3 stations of a similar size in London, Chelsfield is the least punctual, at 80.2%. All of them are ahead, including Strawberry Hill (88.2%), Brimsdown (86.4%) and Wembley Stadium (88.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 30,636 | 80.2% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Chelsfield? Delay Repay
These operators call at Chelsfield and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,385 | 73.1% | 0.7% |
| Period 6 of 2026-27 | 2,298 | 67.7% | 0.4% |
| Period 5 of 2026-27 | 2,369 | 79.6% | 1.9% |
| Period 4 of 2026-27 | 2,318 | 82.9% | 1.7% |
| Period 3 of 2026-27 | 2,384 | 80.4% | 1.8% |
| Period 2 of 2026-27 | 2,352 | 85.7% | 1.4% |
| Period 1 of 2026-27 | 2,560 | 87.1% | 2.6% |
| Period 13 of 2025-26 | 2,562 | 84.2% | 1.9% |
| Period 12 of 2025-26 | 2,384 | 83.9% | 0.9% |
| Period 11 of 2025-26 | 2,320 | 83.3% | 0.8% |
| Period 10 of 2025-26 | 2,065 | 81.6% | 1.7% |
| Period 9 of 2025-26 | 2,252 | 75.0% | 0.7% |
| Period 8 of 2025-26 | 2,387 | 77.9% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Strawberry Hill | 31,153 | 88.2% | 3.0% |
| Brimsdown | 29,950 | 86.4% | 2.6% |
| Wembley Stadium | 29,934 | 88.2% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out