Welwyn North
WLWEast of EnglandManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Welwyn North had 27,657 scheduled stops to Period 7 of 2026-27, about 76 a day. 72.5% of recorded arrivals were within three minutes of the timetable and 5.8% of scheduled stops were cancelled.
Welwyn North opened on 7 August 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Welwyn North is the oldest; the next oldest, Hatfield (Herts), dates from 1850.
The nearest stations to Welwyn North are Welwyn Garden City (2.7 km south), Knebworth (4.8 km north), Watton-At-Stone (6.1 km north-east), Hatfield (Herts) (6.8 km south) and Hertford North (7.4 km east). 9 stations lie within 10 km in all. At 72.5%, Welwyn North is less punctual than all of them; the best of the five, Watton-At-Stone, manages 90.4%.
Welwyn North is named after Welwyn, a Village, home to about 9,307 people, but the station stands 1.8 km from its centre.
Across the whole run of data, the weakest four-week period for Welwyn North was Period 9 of 2024-25, at 57.4%, some time before the latest year. The strongest was Period 1 of 2026-27, at 80.0%, and the two are 22.6 percentage points apart.
Compared with 3 stations of a similar size in East of England, Welwyn North is the least punctual, at 72.5%. All of them are ahead, including Kings Langley (76.7%), Apsley (78.6%) and Knebworth (77.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 27,657 | 72.5% | 5.8% |
Operators with their own page for this station are linked to it.
Late train at Welwyn North? Delay Repay
These operators call at Welwyn North and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,231 | 65.0% | 5.4% |
| Period 6 of 2026-27 | 2,130 | 65.5% | 9.0% |
| Period 5 of 2026-27 | 2,122 | 70.3% | 5.7% |
| Period 4 of 2026-27 | 2,187 | 65.2% | 8.2% |
| Period 3 of 2026-27 | 2,209 | 76.8% | 7.5% |
| Period 2 of 2026-27 | 2,187 | 77.5% | 7.4% |
| Period 1 of 2026-27 | 2,570 | 80.0% | 4.6% |
| Period 13 of 2025-26 | 2,387 | 78.3% | 2.8% |
| Period 12 of 2025-26 | 1,868 | 72.9% | 3.1% |
| Period 11 of 2025-26 | 1,998 | 74.5% | 3.6% |
| Period 10 of 2025-26 | 1,774 | 77.0% | 3.5% |
| Period 9 of 2025-26 | 1,924 | 65.2% | 8.8% |
| Period 8 of 2025-26 | 2,070 | 71.9% | 5.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kings Langley | 27,752 | 76.7% | 5.9% |
| Apsley | 27,953 | 78.6% | 6.4% |
| Knebworth | 28,079 | 77.5% | 5.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out