Apsley
APSEast of EnglandManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Apsley had 27,953 scheduled stops to Period 7 of 2026-27, about 77 a day. 78.6% of recorded arrivals were within three minutes of the timetable and 6.4% of scheduled stops were cancelled.
Apsley opened on 26 September 1938, 88 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hemel Hempstead is the oldest (1837) and Garston (Hertfordshire) the newest (1966), with Apsley in between.
The nearest stations to Apsley are Hemel Hempstead (2.2 km north-west), Kings Langley (3.4 km south-east), Garston (Hertfordshire) (7.6 km south-east), Berkhamsted (7.7 km north-west) and Bricket Wood (7.8 km south-east). 13 stations lie within 10 km in all. Of the five, Garston (Hertfordshire) is the most punctual at 96.3% and Hemel Hempstead the least at 76.6%, with Apsley on 78.6%.
Apsley takes its name from a Village called Apsley, and the station stands 0.8 km from its centre.
Cancellations are a particular problem at Apsley. 6.4% of scheduled stops did not happen, 2.4 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2277th of 2,374.
Compared with 3 stations of a similar size in East of England, Apsley is the most punctual, at 78.6%. The comparison group includes Knebworth (77.5%), Kings Langley (76.7%) and Welwyn North (72.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 27,953 | 78.6% | 6.4% |
Operators with their own page for this station are linked to it.
Late train at Apsley? Delay Repay
These operators call at Apsley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,176 | 78.9% | 5.3% |
| Period 6 of 2026-27 | 2,186 | 76.4% | 8.2% |
| Period 5 of 2026-27 | 2,183 | 76.4% | 9.1% |
| Period 4 of 2026-27 | 2,091 | 77.4% | 5.9% |
| Period 3 of 2026-27 | 2,136 | 80.2% | 5.3% |
| Period 2 of 2026-27 | 2,067 | 74.8% | 12.2% |
| Period 1 of 2026-27 | 2,042 | 78.1% | 6.2% |
| Period 13 of 2025-26 | 2,405 | 84.1% | 4.6% |
| Period 12 of 2025-26 | 2,185 | 80.9% | 4.9% |
| Period 11 of 2025-26 | 2,181 | 79.6% | 6.1% |
| Period 10 of 2025-26 | 1,958 | 80.9% | 5.6% |
| Period 9 of 2025-26 | 2,171 | 76.6% | 4.8% |
| Period 8 of 2025-26 | 2,172 | 76.9% | 4.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Knebworth | 28,079 | 77.5% | 5.7% |
| Kings Langley | 27,752 | 76.7% | 5.9% |
| Welwyn North | 27,657 | 72.5% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out