Knebworth
KBWEast of EnglandManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Knebworth had 28,079 scheduled stops to Period 7 of 2026-27, about 77 a day. 77.5% of recorded arrivals were within three minutes of the timetable and 5.7% of scheduled stops were cancelled.
Knebworth opened on 1 February 1884, 142 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Stevenage is the oldest (1850) and Watton-At-Stone the newest (1924), with Knebworth in between.
The nearest stations to Knebworth are Stevenage (4.1 km north), Welwyn North (4.8 km south), Watton-At-Stone (4.8 km east), Welwyn Garden City (7.4 km south) and Hertford North (10.0 km south-east). 4 stations lie within 10 km in all. Of the five, Watton-At-Stone is the most punctual at 90.4% and Welwyn North the least at 72.5%, with Knebworth on 77.5%.
Knebworth takes its name from a Village called Knebworth, home to about 4,538 people, and the station stands 0.2 km from its centre.
Cancellations are a particular problem at Knebworth. 5.7% of scheduled stops did not happen, 2.1 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2212th of 2,374.
2 of 3 stations of a similar size in East of England are more punctual than Knebworth on 77.5%. The comparison group includes Apsley (78.6%), Kings Langley (76.7%) and Rye House (90.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 28,079 | 77.5% | 5.7% |
Operators with their own page for this station are linked to it.
Late train at Knebworth? Delay Repay
These operators call at Knebworth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,271 | 70.6% | 5.2% |
| Period 6 of 2026-27 | 2,170 | 70.2% | 8.9% |
| Period 5 of 2026-27 | 2,161 | 75.3% | 5.5% |
| Period 4 of 2026-27 | 2,227 | 70.7% | 8.1% |
| Period 3 of 2026-27 | 2,252 | 82.0% | 7.2% |
| Period 2 of 2026-27 | 2,223 | 83.0% | 7.3% |
| Period 1 of 2026-27 | 2,612 | 84.8% | 4.7% |
| Period 13 of 2025-26 | 2,429 | 82.5% | 2.6% |
| Period 12 of 2025-26 | 1,909 | 77.9% | 2.8% |
| Period 11 of 2025-26 | 2,038 | 79.1% | 3.3% |
| Period 10 of 2025-26 | 1,793 | 81.2% | 3.8% |
| Period 9 of 2025-26 | 1,924 | 70.4% | 9.2% |
| Period 8 of 2025-26 | 2,070 | 76.6% | 5.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Apsley | 27,953 | 78.6% | 6.4% |
| Kings Langley | 27,752 | 76.7% | 5.9% |
| Rye House | 28,474 | 90.3% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out